p.1399
p.1407
p.1413
p.1419
p.1424
p.1428
p.1433
p.1437
p.1441
Heavy Oil Gathering Process Test Research
Abstract:
In the present, Xintan Kendong 451-the 4th Kendong union station gathering is heavy oil mixed with hot water process and open operation mode. In the pipeline, without the variation of water content, in closed gathering means, mixed with hot water; mixing activity water and emulsifying gathering process are tested. The results show that the heavy oil gathering process of selection and gathering distance are related, for little variation of the water content and the flow, at about 50 °C. The distance is shorter in the gathering, the use of hot water mixed gathering process more reasonable, when gathering distance is longer, selection of emulsion pipeline gathering process more reasonable.
Info:
Periodical:
Pages:
1424-1427
Citation:
Online since:
December 2012
Authors:
Keywords:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: