Simulation on Slinging and Reshipment System in Mine

Article Preview

Abstract:

Aiming at the problenm of transportation to underground, and slinging, reshipment, assembly in underworkings for mining lage equipment , a set of slinging and reshipment system in the underground is developed. This system is a steel-frame structure consisted of multi-unit bridged structure junction,in which the double T-iron is taken as main load-bearing beam,and U-steel unit welded by back-to-back method is as a slanted prop triangle secondary beam.This system adoptes the three-dimensional modeling software Solidworks2007, and its COSMOS/Works modules, for the three-dimensional modeling and finite element analysis to this system. Through the finite element analysis, verified the correctness of the component design.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

264-269

Citation:

Online since:

December 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Chang Kai. Selection discusses on Coal mine hydraulic support van[J]. Coal Mine Machinery,2010(6), 31(6): 72-74.

Google Scholar

[2] Zhang Xin. The design of four-bar linkage of large inclined angle hydraulic support [R]. 2009 International Conference on Engineering Computation, ICEC 2009, pp.167-170.

DOI: 10.1109/icec.2009.68

Google Scholar

[3] Zhang Lianbao, Wu Zhizhen. The application technology research of integrated mining face pulling face lifting bracket and complex geological conditions[J]. Mining Machinery,2008, 36(19): 29-31.

Google Scholar

[4] Mao Yuhu,Liu Renquan,The design and application of hoisting locks[J],Coal Technology,2006, 25(9):19.

Google Scholar

[5] The fourth design institute of the third machinery industry ministry, The design and calculation of electric beam crane [M]. XI'an:The fourth design institute of the third machinery industry ministry,1976:58-89.

Google Scholar

[6] Wang Jun. Solidworks2007 Introduction and improve[M]. Beijing Science Press,2008:69-98.

Google Scholar

[7] Wang Rongquan,Kou Ziming,Li Xindong. The design and application of Underground tunnels hoisting reproduced system[J]. Coal Mine Machinery,2011(4).

Google Scholar

[8] Cui Zhigang,The development of mine large hydraulic support assembly platform [J],Coal mining,2008, 13(6):76.

Google Scholar