Study on the Life Cycle Security Risks Management of Large-Scale Public Buildings

Article Preview

Abstract:

Viewing from the life cycle of construction project, this paper aims to explore the characteristics, types and causes of life circle security risks in large public buildings on the strength of project risk management theory and the related theories of value chain. It proposes the management strategy for handling the life cycle security risk of large public buildings based on the stage and scope of risk effects respectively, providing the significant reference for the major participants of large public buildings to implement the security risk management and reduce the probability of safe accidents in large public buildings.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 655-657)

Pages:

2209-2215

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Sun Weimin, Yu Hanbin. The Difficulties and Countermeasures in Improving the Safety Production Guarantee System of Enterprises. [J]. Construction Safety, 2005, 20(1): 15-16.

Google Scholar

[2] Ministry of Construction associated with other departments. Suggestions on strengthening the large public construction project management (The Build quality.

Google Scholar

[2007] No. 1 file) [J]. Information of China Construction, 2007(2): 65-67.

Google Scholar

[3] Li Qiming, Zheng Lei, Deng Xiaopeng, Shen Liangfeng. Life Circle Management for Modern Real Estate Projects. [M]. Nanjing: Southeast University Press, (2006).

Google Scholar

[4] Qi Shifang, Jia Yueyang. Study on the Risk Management of Projects [J]. Journal of Taiyuan University of Technology, 2002, 33(1): 95-99.

Google Scholar

[5] Ma Ying, Xie Kefan. Risk Chain and Risk Transmission of Marketing Channel. [J] Journal of Wuhan Universiy of Technology (Information & Management Engineering), 2007, 29(8): 129-132.

Google Scholar

[6] Han Yu, Gao Qiaoming, Luo Yan, Huang Youliang. Risk Characteristics Analysis for Large-scale Public Buildings [J]. Journal of Engineering Management, 2010, 24(1): 37-40.

Google Scholar

[7] Liu Jing, Mao Longquan. Study on the Whole Life Circle Risk Assessment System of Large-scale Public Buildings in China [J]. Construction Economy, 2009(2), 5-9.

Google Scholar

[8] Xia Nankai, Song Haiyu. A System Analysis and Coping Strategy for Risks in Urban Development[J]. Journal of Tongji University (Social Science Section), 2008(8): 39-46.

Google Scholar

[9] Li Wenqing, Li Yue. Study on the Influential Factors upon the Security risk of Nuclear Power Engineering Project [J]. Modern Management Science, 2010(1): 79-81.

Google Scholar

[10] Fan Weizhou, The Security risk Management in Project Construction Process [J]. China High Technology Enterprises, 2009, (11): 107-108.

Google Scholar

[11] Li Qiming, Shen Liyin. Decision-Making Model Incorporating Risk Behavior under Project Risk Management [J]. System Engineering—Theory & Practice, 2001(10): 1-8.

Google Scholar

[12] Wang Yuanming, Zhao Daozhi. The Transmission Model of Controlled Quality Risks in Construction Projects [J]. Journal of Business Economics, 2008, 6: 15-20.

Google Scholar

[13] Jiang Qiyuan, Xie Jinxing. Mathematical Model (the 3rd edition) [M]. Beijing: Higher Education Press, (2003).

Google Scholar

[14] Chen Zhibo. Study on the Entire Life-cycle Dynamic Alliance of Construction Project, [Mater's Dissertation]. Huazhong University of Science and Technology, (2006).

Google Scholar

[15] Peng Benhong, Sun Shaorong, Shen Yunhong. Study on Risk Identification and Appraisal of Dynamic Alliance [J]. Journal of University of Shanghai for Science and Technology, 2006, 28(1): 39-43.

Google Scholar

[16] Song Jinzhao. Research on Virtual Company of Construction Enterprise [Mater's Dissertation]. Xi'an: Xi'an University of Architecture and Technology, (2004).

Google Scholar

[17] Du Wei, Mao Jianbo. Risk Management Research on Life Circle of Projects, [J]. Technology and Market, 2005(5): 52-53.

Google Scholar

[18] Yao Xuande, Wang Mengshu. Study on the System Frame of Risk Evaluation in Subway Engineering [J]. China Safety Science Journal, 2005(8): 88-92.

Google Scholar

[19] Zhang Feilian, Shi Feng, Chen Tao. Economic Risk Post Evaluation for Railway Construction Project Based on Frustration of Transport Price [J]. Journal of the China Railway Society, 2002(12): 6-10.

Google Scholar