Process Analysis of Construction Quality Management System for Water Project Based on Dissipative Structure Theory

Article Preview

Abstract:

Using the dissipative structure theory (DST), the construction quality management system process of water project in China (WPCQMS) is analyzed in this paper. In the history of development, the process of the participants of WPCQMS gradually undertake quality management responsibility can be divided into the following several major stages: quality self-control stage of construction unit, quality collaborative control stage of owner unit, quality supervision stage of supervision unit, and quality supervision stage of government agency. Furthermore, the existing main problems of WPCQMS are analyzed, and it is put forward that the reforming orientation of WPCQMS should establish the three systems, including the main construction body quality management endurance system, the government quality supervision system, and the social credit assessing system.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 655-657)

Pages:

2230-2234

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Immanuel Wanerstein. The End of the World as We Know It: Social Science for the Twenty-First Century [M]. Minneapolis: University of Minnesota Press, 1999. 260.

Google Scholar

[2] Zhan Kenhua. Prigogine and dissipative structure theory [M]. Xian, Shanxi science and technology publishing house. 1998: 348.

Google Scholar

[3] Wu Lingqing. Quality management system basic course [M]. Beijing: Beijing Institute of Technology Press, 2007: 37-43.

Google Scholar

[4] Gong Jianchong, Yang Xueling. Take foreign management experiences as a reference: boosting reform of engineering quality management system [j]. journal of engineering quality, 2001. 9: 14-16.

Google Scholar