[1]
LiWenbo, LiGuilai, WuChunyuan. Wastewater treatment in tunnel construction processing [J]. West-china Exploration Engineering, 2005(11): 115.
Google Scholar
[2]
ZhouHaiyan, LuoWeihua. The design on the wastewater treatment of Xuefengmountain Super Long Road Tunnel [J]. Central South H ighway Engineering, 2006(2): 113-115.
Google Scholar
[3]
YangBin, JiangHongmei, WuDongguo. Discussion on Waste Water Disposal Technology in HighwayTunnel Construction [J]. Technology of Highway and Transport,2008(6):162-164.
Google Scholar
[4]
HuangYongju. Highway tunnel construction environmental protection practice and research [J]. West-china Exploration Engineering, 2007(8): 152-158.
Google Scholar
[5]
ZhengXinding, DingYuanjian,. Analysis of the influence of tunnel construction waste water on water environment and countermeasures [J]. Modern tunneling technolgy, 2007(6): 82-84.
Google Scholar
[6]
YngBin, MoPing, WuDongguo. Analysis of Characters of Quality of Waste Water from Tunnel Construction [J]. Technology of Highway and Transport, 2009, (3): 133~137.
Google Scholar
[7]
JiangHongmei, MoPing. The research of Mountain tunnel construction wastewater quality characteristics[J]. China Environmental Science Society academic annual meeting papers (2009).
Google Scholar
[8]
Kenny S. W. Wong. Effective wastewater treatment/recycling technologies for construction industry-a local experience[J]. Advances in Building Technology, 2001, 105(1 2): 62-66.
DOI: 10.1016/b978-008044100-9/50177-7
Google Scholar
[9]
YangChangjian. SPA on Water Pollution during Tunnel Construction and Biological Test Verification [J]. Modern Transportation Ttechnolgy, 2008, 5(5): 85-88.
Google Scholar
[10]
QuanYuanchen,LinaZhang. Influenceof carbonation on the acid neutralization capacity of ce-ments and cement-solidified/stabilized electroplating sludge[J]. Chemosphere,2009,74:758-764.
DOI: 10.1016/j.chemosphere.2008.10.044
Google Scholar
[11]
AmitBhatnagar,Ashwani Kumar. Utiliza-tion of industrial waste for cadmium removal from waterand immobilization in cement [ J ] . Chemical EngineeringJournal,2009,150:145-151.
Google Scholar
[12]
PangXueshi. Technology and application of hydraulic cyclone [M]. Beijing: China Petrochemical Press, (2011).
Google Scholar
[13]
PangXueshi. The method of Hydraulic cyclone separation size calculation [J]. Metallic Ore Dressing Abroad , 1992 , (05): 17-26.
Google Scholar
[14]
NiLingying. Cyclone Research and its prospect of application in petroleum industry [J]. Journal of Filtration & Separation99, (3): 3-6.
Google Scholar
[15]
The Central People's Government of the PRC. Water and wastewater monitoring analysis method (Fourth Edition) [M]. BeiJing: China Environmental Science Press, (2002).
Google Scholar
[16]
Integrated wastewater discharge standard(GB 8978—1996)[S] BeiJing: ChinaPlanning Press, (1996).
Google Scholar