Developing a Model for Risk and Responsibility Management Share Amongst Stakeholders Consortium in Construction Projects

Article Preview

Abstract:

The construction project is a complex sector which characterized with low productivity, cost and time overruns and conflicts. The major challenges in construction project risk assessment which may attributed to knowledge requirements for determining the level of uncertainty and development of complex models to predict . Portfolio theory and capital market theory stipulate that risk consists of two types, First, systematic risk, which cannot be controlled, emanates from external factors such as acts of God, natural disasters, market risk, interest-rate risk, and purchasing-power risk. Second, unsystematic risk, which can be controlled, relates to organization-specific factors such as business risk and financial risk (Fischer and Jordan 1996).) . To identifies the risk factors that influence the cost-effective management, operation, and maintenance of construction project, as well as how and when in the project life cycle the identified risk factors impact to the associated costs . The identification and design of risk is the first step of risk management. It contain the recognition of potential risk event conditions in a project and the clarification of risk responsibilities. A total of 50 risk factors on construction for stake holders (client , contractor ,consultant ) share projects were identified after conducting an extensive literature survey. A questionnaire survey was conducted from 60 project managers(20 from each category) in all three proficiencies with background experience in buildings ,road and bridges with minimum 15 years experience , to identify the most significant risk factors impact in construction projects . Interviews were conducted face to face, ensuring a 100 percent response rate. The questionnaire was amended by incorporating feedback of the experts to suit the local environments of the construction industry. The weight or rate of each risk factor gained by using a five-point Liker scale from a consolidated conceptual framework of all 50 risk factors identified from the deep literature work . The main aim of these research is to identify ,categorize and ranking common risks, exert management techniques to address those risks , effective risk management and risk status in the construction industry and to help stakeholders to take stock of their ongoing and future projects, with a focus on important risks, their management techniques and barriers to effective implementation of risk management systems.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

639-643

Citation:

Online since:

April 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Tang, W., Qiang, M., Duffield, C. F., Young, D. M., and Lu, Y. (2007). Risk management in Chinese construction industry., J. Constr. Eng. Manage., 133(12), 944-956.

DOI: 10.1061/(asce)0733-9364(2007)133:12(944)

Google Scholar

[2] Smith, N. J., Merna, T., and Jobling, P. (2006). Managing risks in construction projects., Blackwell Science, Oxford, London.

Google Scholar

[3] Lewis, D. (1995). 'The future of forecasting—Risk analysis and philosophy of transportation planning., J. TR News, Transportation Research Board, Washington, D.C., 3–9.

Google Scholar

[4] Wood, G. D., and Ellis, R. C. T. (2003). Risk management practices of leading UK cost consults., Eng., Constr., Archit. Manage., 10(4), 254–262.

Google Scholar

[5] Schexnayder, C., Weber, S. L., and David, S. A. 2004. Transportation agency use of owner-controlled insurance programs., J. Constr. Eng. Manage., 1304, 517–524.

DOI: 10.1061/(asce)0733-9364(2004)130:4(517)

Google Scholar

[6] Rahman, M. M., and Kumaraswamy, M. M. (2002a). Joint risk management through transactionally efficient relational contracting., Constr. Manage. Econom., 20(1), 45-54.

DOI: 10.1080/01446190110089682

Google Scholar

[7] Baldry, D. (1998). The evaluation of risk management in public sector capital projects., Int. J. Proj. Manage., 16(1), 35–41.

Google Scholar

[8] Chapman, C. (1997). Project risk analysis and management-PRAM the generic process., Int. J. Proj. Manage., 15(5), 273-281.

DOI: 10.1016/s0263-7863(96)00079-8

Google Scholar

[9] Kliem, R., and Ludin, I. (1997). Reducing project risk, Gower Publishing, UK.

Google Scholar