Concepts of Risk in Construction Projects

Article Preview

Abstract:

Risk is a part of business endeavours because of uncertainty (Flanagan and Norman 1993; Fischer and Jordan 1996). Portfolio theory and capital market theory stipulate that risk consists of two types, First, systematic risk, which cannot be controlled, emanates from external factors such as acts of God, natural disasters, market risk, interest-rate risk, and purchasing-power risk. Second, unsystematic risk, which can be controlled, relates to organization-specific factors such as business risk and financial risk(Fischer and Jordan 1996). These forms of risk are fundamental to the construction and the insurance industries.( Tah et al. 1993) . The construction project is a complex sector which characterized with low productivity, cost and time overruns and conflicts. The major challenges in construction project risk assessment which may attributed to knowledge requirements for determining the level of uncertainty and development of complex models to predict . To identifies the risk factors that influence the cost-effective management, operation, and maintenance of construction project, as well as how and when in the project life cycle the identified risk factors impact to the associated costs .The web- based tool can be used by decision -makers during the pre-planning stage of construction projects to estimate cost and duration implications of various risk occurrence scenarios, determine contingencies and prepare risk management plans . In this research the author considered all key articles in the related research streams in recent 30 years and analyzed the risk management views in order to identify key risk factors and its impact on the construction projects.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

644-649

Citation:

Online since:

April 2013

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Tang, W., Qiang, M., Duffield, C. F., Young, D. M., and Lu, Y.(2007). "Risk management in Chinese construction industry." J. Constr. Eng. Manage., 133(12), 944-956.

DOI: 10.1061/(asce)0733-9364(2007)133:12(944)

Google Scholar

[2] Hastak, M., Halpin, D. W., and Vanegas, J. (1996). ''COMPASS—New paradigm for project cost control strategy and planning.'' J. Constr. Engrg. and Mgmt., ASCE, 122(3), 254–264.

DOI: 10.1061/(asce)0733-9364(1996)122:3(254)

Google Scholar

[3] Lewis, D. (1995). ''The future of forecasting—Risk analysis and philosophy of transportation planning.'' J. TR News, Transportation Research Board, Washington, D.C., 3–9.

Google Scholar

[4] Manning, D., and NCHRP. (1985). Detecting defects and deterioration in highway structures—Synthesis of highway practice 118, National Research Council, Washington, D.C.

Google Scholar

[5] [10] Liu, M., and Ling, Y. Y. (2005). "Modeling a contractor's markup estimation." J. Constr. Eng. Manage., 131(4), 391–399.

DOI: 10.1061/(asce)0733-9364(2005)131:4(391)

Google Scholar

[6] Flanagan, R., and Norman, G. (1993). Risk management and construction, Blackwell, Oxford .

Google Scholar

[7] Akintoye, A. S., and MacLeod, J. M. (1997). "Risk analysis and management in construction." Int. J. Proj. Manage., 15(1), 31–38

Google Scholar

[8] Ahmed, S. M., Azhar, S., and Ahmad, I. (2002). "Evaluation of Florida general contractor's risk management practices." J. Constr. Eng., CIB, 17(1), 4–11 .

Google Scholar