Double-Workshop Plan Model of Mixed Chlor-Alkali Production Process

Abstract:

Article Preview

Double-workshop mixed chlor-alkali planned model production process is a multi-level multi-product multi-constraint mixed batch planning problem production line model, taking into account the actual production of joint production of dual-workshop mode of production to determine the products and materials at various workshops, various Plan period on the production quantity, at the end of each period to meet the delivery needs of the type and quantity simultaneously, during the product implementation plan the goal of profit maximization. It uses particle swarm algorithm to reach the answer, indicating the feasibility of the method and effectiveness through examples of the calculation.

Info:

Periodical:

Advanced Materials Research (Volumes 69-70)

Edited by:

Julong Yuan, Shiming Ji, Donghui Wen and Ming Chen

Pages:

611-615

DOI:

10.4028/www.scientific.net/AMR.69-70.611

Citation:

X. H. Dai et al., "Double-Workshop Plan Model of Mixed Chlor-Alkali Production Process", Advanced Materials Research, Vols. 69-70, pp. 611-615, 2009

Online since:

May 2009

Export:

Price:

$35.00

In order to see related information, you need to Login.