Double-Workshop Plan Model of Mixed Chlor-Alkali Production Process

Article Preview

Abstract:

Double-workshop mixed chlor-alkali planned model production process is a multi-level multi-product multi-constraint mixed batch planning problem production line model, taking into account the actual production of joint production of dual-workshop mode of production to determine the products and materials at various workshops, various Plan period on the production quantity, at the end of each period to meet the delivery needs of the type and quantity simultaneously, during the product implementation plan the goal of profit maximization. It uses particle swarm algorithm to reach the answer, indicating the feasibility of the method and effectiveness through examples of the calculation.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 69-70)

Pages:

611-615

Citation:

Online since:

May 2009

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2009 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation: