Comparison on Dam Risk Consequences Comprehensive Evaluation Model

Article Preview

Abstract:

Many evaluation factors are involved in dam risk consequences comprehensive evaluation, which exist plenty of uncertainty and correlation between each other. Combined the five methods, such as linear weighted sum method, fuzzy mathematics method, matter element method, gray correlation method and principal component method with dam risk consequences comprehensive evaluation, establishing five dam risk comprehensive evaluation models, applying to the level evaluation of Changlong Reservoir, Xialan Reservoir, Shibikeng Reservoir, Longshan Reservoir, Lingtan Reservoir successfully.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 785-786)

Pages:

1465-1468

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] WANG Ren-zhong, LI Lei, SHENG Jin-bao, et al. The model application research report on sort of reinforcement of dangerous reservoirs[R] . Nanjing: Nanjing Hydraulic Research Institute, (2005).

Google Scholar

[2] LI Lei, WANG Ren-zhong, SHENG Jin-bao, et al. Dam risk assessment and risk management [M]. Beijing: China WaterPower Press, (2006).

Google Scholar

[3] SUN Wei-wei, LI Lei. Comprehensive hazard assessment model for the consequence caused by the dam failure based on the matter element method [J]. Journal of Safety and Environment, 2009, 9(2): 173~176.

Google Scholar