Application of the CRD Method in Construction of an Ultra-Shallow, Ultra-High Section and Large-Span Mined Tunnel

Article Preview

Abstract:

This paper explain the controllable factors of the application of the CRD method in the construction of an ultra-shallow, ultra-high section and large-span mined tunnel. And it also introduce the construction scheme of the application on the background of the Ou-Zhuang station air duct C of Guangzhou Metro line No.5. The practical application shows that the CRD method is not only an applicable method but also a necessary means for this kind of tunnel.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

231-234

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wang Yujun, Cui ChengWu. CRD workers in urban subway station construction application [J]. Railway Construction Technology, 2007, z1 (increase) : 126-129.

Google Scholar

[2] Huang MingQi. Weak strata large cross section (Xiamen) undersea tunnel stability control study [D]. Shandong University of Technology, (2008).

Google Scholar

[3] Zhao PengShe. About CRD large section tunnel construction method optimization Railway Construction 2010 No. 8 77-80.

Google Scholar

[4] Bo DongPing, Wang Shengli 209m2 enlarged sectional stony rock tunnel construction method CRD technology. Railway Standard Design. 2008 11 73-76.

Google Scholar