Maintenance Project Scheduling Model Considered Flexible Resource with Capability Difference

Article Preview

Abstract:

Maintenance task scheduling during mission break is described as flexible resource constraint project scheduling problem, and flexible resource constraint maintenance task scheduling model is established. Since capability level of flexible resource is different, the thesis establishes maintenance task scheduling model considering capability difference. To resolve the model, a particle swarm optimization (PSO) algorithm based on activity list is presented. At last, a case study is present.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 791-793)

Pages:

1566-1569

Citation:

Online since:

September 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Odile Bellenguez, Emmanuel Ne'ron: Lecture Notes in Computer Science, vol. 16( 2005) p.229 – 243.

Google Scholar

[2] Kardrou Y, Najid N M. In: Proceedings of IMACS Multi-conference on Computational Engineering in Systems Applications (CESA), October, 2006, Beijing.

Google Scholar

[3] Yu Xiao-guang, Zhan De-chen, NIE Lan-Shun et al. Computer Integrated Manufacturing Systems, vol. 16(2010) , p.1967-(1976).

Google Scholar

[4] Huang Min-mei. Research on Flexible Resource-Constrained Project Scheduling Problem. Wuhan: Wuhan Technology University, 2007. (in Chinese).

Google Scholar

[5] Kolisch R, Sprecher A. Eur. J. Oper. Res. Vol(96), 1997, p.205–216.

Google Scholar

[6] Kolisch R, Sprecher A. PSPLIB-A Project Scheduling Problem Library. http: /129. 187. 106. 231 /psplib/indes. html (2010).

DOI: 10.1016/s0377-2217(96)00170-1

Google Scholar

[7] Deng Linyi. Dalian university of technology, 2008. (in Chinese).

Google Scholar