Advanced Materials Research
Vols. 931-932
Vols. 931-932
Advanced Materials Research
Vols. 926-930
Vols. 926-930
Advanced Materials Research
Vol. 925
Vol. 925
Advanced Materials Research
Vol. 924
Vol. 924
Advanced Materials Research
Vol. 923
Vol. 923
Advanced Materials Research
Vol. 922
Vol. 922
Advanced Materials Research
Vols. 919-921
Vols. 919-921
Advanced Materials Research
Vol. 918
Vol. 918
Advanced Materials Research
Vol. 917
Vol. 917
Advanced Materials Research
Vols. 915-916
Vols. 915-916
Advanced Materials Research
Vols. 912-914
Vols. 912-914
Advanced Materials Research
Vol. 911
Vol. 911
Advanced Materials Research
Vol. 910
Vol. 910
Advanced Materials Research Vols. 919-921
Paper Title Page
Abstract: In order to achieve effective stress management in rock drivage team, this paper use fault tree analysis method to build fault tree model for the stress management of rock borehole-blasting drivage team. Under this model, the stressor of rock drivage team is identified, the logical relationship between the stressor and work of errors in rock drivage team is analyzed, the corresponding recommendations for the stress management of coal companies are provided.
873
Abstract: In this context, firstly, the safety evaluation index system of subway operation is established on the basis of the recognition and analysis of risk factors. Then, the paper constructs the multi-level extensible evaluation model for subway operation safety with the extension method as the core. Finally, Beijing Changping subway is studied as an example. The risk degrees of the line and its subsystems are determined. A new method for comprehensive evaluation of subway operation safety in china is put forward.
878
Abstract: Basing on the theory of maag cylindrical diffusion, back grout diffusion radius and grouting pressure formula of shield tunnel were derived in two cases of the viscosity time-dependent behavior or not.The distribution law of diffusion radius and the pressure to segments were obtained by applicating the spreading model in some project.The results show that grout diffusion radius and grouting pressure both increase with the increasing of grouting time and grouting pressure whether considering the viscosity time-dependent behavior or not.In the same grouting time (pressure),the calculated values that unconsidering the viscosity time-dependent behavior are bigger than the values of considering.
883
Abstract: On the basis of unfavorable geology of a passageway in subway station to cross urban trunk road with heavy traffic flow in Chengdu city, the comparison of two different driving methods for the underground passageway with three arches and two pillars is carried out in the paper. The result shows that both center drift-pillar method and partial bench-cut method can be used to build the passageway in the subway station. But the latter is superior to the former in reducing construction cost, risk and timescale. While the former is more efficient in controlling ground subsidence. The tubular roof protection is also designed to reinforce the shear strength of soil above the crown of the passageway before excavating the poor surrounding soil. The inventive driving procedure of partial bench-cut method presented in the paper can be utilized to guide the rational design and economical construction of shallow passageway for subway station to cross urban trunk road in weak geological strata.
887
Abstract: To study the lining deformation characteristic of the cold region tunnel under the frost heaving force, a model test was designed, and the low temperature environment in the tunnel of model was made by refrigeration equipment, the groundwater inside the model was frozen, the lining structure deformation characteristic under the frost heaving force was analyzed. The results show that the lining was distorted under the frost heaving force, the lining strain of the tunnel crown and side wall was greatly, the maximum strain is 122μ, the lining strains of inverted arch and foot of wall was less, the minimum strain is 25μ.
891
Abstract: Displacement caused by tunnel excavation soil may cause the deformation of the buildings or structures nearby and even cause disaster. On the background of a large diameter slurry shield obliquely Under-passing embankment of The Yangtze River. First of all, three dimensional finite element method is used to make a dynamic analysis of the embankment settlement. And the result is compared with the measured values, the accuracy of the finite element method was verified. Then, the stratum settlement of embankment is analyzed under different cross Angle and depth of tunnel. Some useful conclusions are drawn, which can provide some useful reference for similar engineering of tunnel under-passing embankment.
895
Abstract: Line 2 of Xi’an subway is the earliest subway in Shaanxi , its safety has not been fully and thoroughly checked because of the perfect record of non-fault during its operation. In this paper, facility, management and fault indexes are set up, and the and indexes are also built through the organization and responsibility analysis of subsystem so as to safety assessment index system. Finally, AHP and fuzzy evaluation method are used to evaluate the subway operation results and propose appropriate corrective measures.
902
Abstract: So far, due to the complexity of underground engineering, a mature and proper method used to determine rock pressure is not for sure. For now, method to design lining structure mainly adopts empirical design, assisted by load structure method. The paper assesses the safety of lining structure from two aspects, that is, from load structure method and from strength reduction method. The results indicate that compared with strength reduction method to evaluate safety of the lining structure, load structure method is relatively conservative.
907
Abstract: To assess the potential of seismic stability for the southern region of Tangshan city, five factors are considered, including fault zones, engineering geological condition, hydrogeology condition, dynamic coefficient and site category. In this paper, the process and digitalization and visualization technology of evaluation method for site seismic stability is proposed based on ArcGIS. The overlay method is automatic realized and the seismic stability potential diagram of Tangshan and its southern region is given, which overcomes the drawback that can't automatic classification of other GIS instruments, then time is greatly saved and the efficiency is improved.
915
Abstract: Based on the finite element model of slope, the stability and dynamic response of sand slope are studied. The results show that with the increase of groundwater, the maximum horizontal displacement of slope shows increasing trend, and reach maximum horizontal displacement on the top of the slope, and the displacement under near-field earthquake is greater than that under far-field earthquake. The accelerations with groundwater are less than that without groundwater, which shows that the existence of groundwater damps vibration. Without considering the groundwater, the destruction of slope is mainly the circular shearing damage through the slope toe, while the destruction is not yet through the slope toe, but from a point on the front of slope.
921