Research on the Knowledge of Contract for Construction Project Management

Article Preview

Abstract:

Faced with the current status of actual engineering, this paper adopts the method of fuzzy matrix to build the knowledge database of contract for construction project, and uses the fuzzy weighted closeness degree to realize similarity matching on existing putted forward contract and the undetermined contract knowledge, looking for similar case contract, determines the backlog terms of the contract on the basis of simlar contents of contract case file. It is of great importance to the solution of the contract management properly and help contractors avoid risks reasonably.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 926-930)

Pages:

3918-3921

Citation:

Online since:

May 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhu Qiming. Construction project contract management. Beijing: China building industry press, 2009. 5.

Google Scholar

[2] Construction project contract and claim management. Science press, (2001).

Google Scholar

[3] Ren Junde. About the contract disputes in the contract review of related research, Construction of shanxi, 2003 (1), pp.98-107.

Google Scholar

[4] Zhong Liang. About the contract interface management of related research, The Chinese and foreign construction, 2007 (9), pp.45-51.

Google Scholar

[5] Su Kang, picture. Research on interface of construction project management, Building the economy, 2006 (7), pp.87-91.

Google Scholar

[6] Cheng Lanyan, Ding Lieyun. Research on large construction contract interface management in related studies of numerous contractual relationship in the contract system, Building economy, 2004 (1), pp.78-83.

Google Scholar

[7] Chen Shuili. Fuzzy set theory and its application. Science press. 2005, 9.

Google Scholar