[1]
Abba, Wanyne Y . Earned Value Management-Reconciling Government and Commercial Practices: For People Involved in Earned Value-Government Industry Academic or Consulting-These Are Exciting Times[J]. PM: Special issue, January-February 1997: 56-58. (Chinese).
Google Scholar
[2]
Brown , John W. Evaluation of Project Using Critical Path Analysis and Earned Value in Combination[J]. Project Management Journal, 1985(5): 59-63. (Chinese).
Google Scholar
[3]
Brandon Jr., Daniel M. Implementing Earned Value Easily and Effectively[J]. Project Management Journal, 1998(2): 80-85. (Chinese).
Google Scholar
[4]
Fleming , Keppelman. Earned Value Management : Mitigating the Risks Associated with Construction Projects[J]. Cost Engineering, 2002(4): 32-36. (Chinese).
Google Scholar
[5]
Leila Moslemi Naeni, Shahram Shadrokh, Amir Salehipour. A fuzzy approach for the earned value management[J]. International Journal of Project Management, 2010(07): 12-20. (Chinese).
DOI: 10.1016/j.ijproman.2013.02.002
Google Scholar
[6]
Sun Xianwei. The Earned Value Analysis Principle in the Project Management and the Development [J]. Modern Finance and Economics, 2002(12): 32-35. (Chinese).
Google Scholar
[7]
Chang Qing, Ji Ge-di, Li Chang-qing. The Research to Second-level Earned Value Method For Improve Performance Measurement of Engineering Project [J]. Chinese Journal of Management Science, 2006(02): 32-34.
DOI: 10.1109/icise.2010.5691763
Google Scholar
[8]
Zhang Jian, Wang Hui, Gao Fei. Applied Research of Earned Value Management on Heavy Weapon Equipment Development Project [J]. Journal of Academy of Military Transportation, 2009(01): 86-88. (Chinese).
Google Scholar
[9]
David S. Christensen , Daniel V. Ferens. Using Earned Value for performance measurement on software development projects[J]. Acquisition Review Quarterly, 1995(4): 19-22.
Google Scholar
[10]
Kim, EunHong; Wells Jr, William G.; Duffey, Michael R. A model for effective implementation of Earned Value Management methodology[J]. International Journal of Management, 2003(21): 33-35. (Chinese).
DOI: 10.1016/s0263-7863(02)00049-2
Google Scholar
[11]
Bryde.D. J, Joby.R. Incentivising project performance in the construction of new facilities: Utilising the earned value-based method[J]. Journal of Facilities Management, 2007(2): 43-49. (Chinese).
DOI: 10.1108/14725960710751889
Google Scholar
[12]
Vanhoucke M, Vandevoorde . A simulation and evaluation of earned value metrics to forecast the project duration[M]. Journal of the operational research society, 2007: 1361-1374. (Chinese).
DOI: 10.1057/palgrave.jors.2602296
Google Scholar
[13]
Zhou shu-fa, Zhou Shen. Application of earned value method in the management of the army in the engineering project [J]. Military Economic Research, 2009(03): 33-35.
Google Scholar
[14]
CUI Xiao-ning, XUE Yong, WU Xiao-jun. Research on Applying the Earned Value Method in the Cost and Schedule Control of Equipment Acquisition[J]. Journal of Institute of Command and Technology, 2005(06): 22-25. (Chinese).
Google Scholar
[15]
Zhang Liang, Liu Bin, Maio Jie. Research on project management of logistic equipment analysismethod based on Earned value analysis [J]. Contemporary Economics, 2011(04): 64-65. (Chinese).
Google Scholar