Analysis of Passive Residual Heat Removal System at Primary Side when Station Blackout Occurs

Article Preview

Abstract:

This paper regarded CNP1000 power plant system as the research object, which is the second-generation half Nuclear Reactor System in our country, and tried to set Westinghouse AP1000 passive residual heat removal system to the primary circuit of CNP1000. Then set up a simulation model based on RELAP5/MOD3.2 program to calculate and analyze the response and operating characteristic of passive residual heat removal system on assumption that Station Blackout occurs. The calculation has the following conclusions: natural circulation was quickly established after accident, which removes core residual heat effectively and keep the core safe. The residual heat can be quickly removed, and during this process the actual temperature was lower than saturation temperature in reactor core.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 986-987)

Pages:

231-234

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Jin SHEN, Guangming JIANG, Gang TANG. Preliminary study of AP1000 passive safety system [J]. Foreign Nuclear Power, 2006, 1: 1-6.

Google Scholar

[2] Schulz T L. Westinghouse AP1000 advanced passive plant. Nuclear Engineering and Design. 2006(236): 1547-1557.

DOI: 10.1016/j.nucengdes.2006.03.049

Google Scholar

[3] Chengge LIN, An Advanced Passive Plant AP1000[M]. BEIJING, Atomic Energy Press, (2010).

Google Scholar

[4] Tianhong YUAN, Lei YU, Chuan WANG. Research on Passive Residual Heat Remove System Under Loss of Power[J]. Atomic Energy Science and Technology,(2010).

Google Scholar

[5] AP1000 European Design Control Document Rev. 1 [R]. America: Westing House Electric Company LLC, (2009).

Google Scholar