A Constructed PQ2 Chart for Calculating the Optimized Process Parameters in Die Casting of Aluminum Alloy

Article Preview

Abstract:

According to the elementary principle of fluid dynamics, the process of die casting formation of the machine line, die line, optimized operating point is discussed in this paper. Use Access to link the data with functions for each part of these, fix them together in a PQ2 chart, form a production window which could be used in all aluminum alloy achieved is illustrated in this paper.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 998-999)

Pages:

518-521

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] S.J. Li: Hydrodynamics, Macmillan, China, 1980, pp.27-46.

Google Scholar

[2] J.J. Li, D.Q. Li, Tooling Design and CAD, Macmillan, China, 2006, pp.204-206.

Google Scholar

[3] Dais A J: The foundation of PQ2 diagram theory J. Die Casting Engineer, Vol. 22 (1987), pp.26-34.

Google Scholar

[4] Dan Zabel: The PQ2 diagram: Part 1, J. Die casting engineer, vol. 24 (1980), No. 5, pp.46-51.

Google Scholar

[5] B.C. Liu, PQ2 theory in die casting, J. Foundry Technology, vol. 53 (2004), pp.929-931.

Google Scholar

[6] Y.P. Yang, L. Wang: Special Casting and Nonferrous Alloys, vol. 27 (2007), pp.44-45.

Google Scholar