[1]
Haqqi, Halifa, and H. Wijayati, Revolusi industri 4.0 di tengah society 5.0: sebuah integrasi ruang, terobosan teknologi, dan transformasi kehidupan di era disruptif. Anak Hebat Indonesia, 2019.
Google Scholar
[2]
F. Khoirunnisa, "Penetapan Harga Pokok Produksi Full Costing Dan Activity Based Costing Pada Pengolahan Susu Kedelai 'Fresh Soya' Pada Lembaga Griya Utama Jatibening-Bekasi," 2012.
DOI: 10.31958/jtm.v8i2.7978
Google Scholar
[3]
Y. Amran, "Pemanfaatn Limbah Plastik Untuk Bahan Tambahan Pembuatan Paving Block Sebagai Alternatif Perkerasan Pada Lahan Parkir di Universitas Muhammadiyah Metro," J. Proram Stud. Tek. Sipil, vol. 4, no. 2, p.125–129, 2015.
Google Scholar
[4]
Y. Hasibuan, A. M. Rambe, and R. Ginting, "Rancangan Perbaikan Stopcontact Melalui Pendekatan Metode Dfma (Design for Manufacturing and Assembly) Pada Pt. Xyz," J. Tek. Ind. USU, vol. 1, no. 2, p.34–39, 2013.
Google Scholar
[5]
R. Kapojos et al., "Penerapan Metode Activity Based Costing Dalam Penentuan Harga Pokok Produksi Pada Perusahaan Roti Lidya Manado," vol. 2, no. 2, p.1120–1129, 2014.
DOI: 10.47201/jamin.v1i1.4
Google Scholar
[6]
N. Rahmadani, "Penentuan Harga Pokok Produksi Pembangunan Rumah Dengan Menggunakan Metode Activity Based Costing (Studi pada Perum Perumnas Regional VII Makassar)," Universitas Islam Negeri Alauddin Makassar, 2016.
DOI: 10.24252/mapan.v5n2a6
Google Scholar
[7]
A. Ardianto and A. Suryadi, "Pengembangan Produk Mesin Pencuci Telur Bebek Secara Semi Otomatis Dengan Metode Design for Manufacture and Assembly (Dfma)," Juminten, vol. 2, no. 2, p.13–24, 2021.
DOI: 10.33005/juminten.v2i2.231
Google Scholar
[8]
B. Indrawijaya, "Pemanfaatan Limbah Plastik Ldpe Sebagai Pengganti Agregat Untuk Pembuatan Paving Blok Beton," J. Ilm. Tek. Kim., vol. 3, no. 1, p.1–7, 2019.
DOI: 10.32493/jitk.v3i1.2594
Google Scholar
[9]
C. Roxas, C. L. ., Dela Cruz, O. G. ., C. Dela Cruz, . R. L. ., De Pedro, J. P. Q., R. Dungca, J. ., A. Lejano, B. ., & C. Ongpeng, J. M. "Application of design for manufacturing and assembly on temporary shelters in the philippines". GEOMATE Journal, 24(103), 120–127. 2023.
DOI: 10.3390/buildings13051164
Google Scholar
[10]
Balqis, I. Z. ., Rusindiyanto, R., & Widjajati, E. P."Redesign of water filter using design for manufacturing and assembly to minimize cost and time". International Journal of Industrial Optimization, 3(2), 131–140. 2022
DOI: 10.12928/ijio.v3i2.6647
Google Scholar
[11]
Minullin, R., Anna, M., & Innesa, K. "Using of opration processes chart in procurement management in a construction company ". E3S Web Of Conferences, Vol 91, 2019.
Google Scholar
[12]
Pratiwi, A. I., Hakim, A., & Santosa, R. Y. "Development of operation process map and analysis of inventory control based on material requirement planning in assembly line". Journal of Industrial Engineering and Halal Industries, 1(1), 30–38. 2020
DOI: 10.14421/jiehis.1800
Google Scholar
[13]
Favi, C., Garziera, R., & Campi, F. "A Rule-Based System to Promote Design for Manufacturing and Assembly in the Development of Welded Structure: Method and Tool Proposition". Applied Sciences, 11(5), 2326. 2021. MDPI AG. Retrieved from
DOI: 10.3390/app11052326
Google Scholar
[14]
Kristina Tirol-Carmody, Nadia Kardash, Karin Chang & Meghan Ecker-Lyster . "Adopting an Activity-Based Cost Management Model at A Community College: A Case Study", Community College Journal of Research and Practice, 44:7, 482-491, 2020
DOI: 10.1080/10668926.2019.1616005
Google Scholar