Budget Estimate Management Information System for Blast Furnace Coal Powder Injection Project

Article Preview

Abstract:

Rapid, accurate and standardized budget estimate is the basis of project bidding, which involves a lot of data information verification and charts. At present, many companies often use the traditional manual method in project budget estimate, which is time-consuming and error-prone. Aiming at the requirements of blast furnace coal powder injection project bidding, this paper developed a blast furnace coal powder injection project budget estimate management information system by using Visual Basic 6.0 and SQL Server database technology, introduced its overall function modules and the key technologies, including system role represent and use case analysis, the system data storage methods, report forms customization methods and so on. Finally, an applied case is given, which can make the project budget estimate conveniently, quickly and accurately, and can reduce the labor intensity of project information management.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 467-469)

Pages:

119-122

Citation:

Online since:

February 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Fortune, C. Process standardization and the impact of professional judgement on the formulation of building project Estimate t price advice, Construction Management and Economics, 2006, 24, (10), pp.1091-1098.

DOI: 10.1080/01446190600851116

Google Scholar

[2] D. Huichao, et al. Study on construction management model and information management system of large-scale engineering project in Proc. International Conference on Management and Service Science, 20-22 September, 2009, IEEE Computer Society, pp.1-6.

DOI: 10.1109/icmss.2009.5302984

Google Scholar

[3] L. Raymond and F. Bergeron, Project management information systems: An empirical study of their impact on project managers and project success, International Journal of Project Management, Vol. 26, No. 2, 2008, pp.213-220.

DOI: 10.1016/j.ijproman.2007.06.002

Google Scholar

[4] Long Ma workroom, Visual Basic 6. 0 Programming (Posts & Telecom Press, China, 2008).

Google Scholar

[5] Redmond, Wash. Microsoft SQL server 2005: database essentials: step by step / Solid Quality Learning (Shanghai World Publishing Corporation, China, 2007).

Google Scholar

[6] Yongming Wang, Development of Definition Tool of Process Card in CAPP, Mechanical Engineers, 2004, (12), pp.15-16 (In Chinese).

Google Scholar