During the pipe jacking construction, the bearing plates of jack need the support of great reactive force which is provided by the side-wall of the working shaft and the soil mass behind the wall. In the shallow pipe-jacking working shaft, the soil mass only can provide limited reactive force due to the small height of the soil mass behind the side-wall, which becomes the difficult point in the design and construction of the shallow pipe-jacking working shaft. This thesis takes the actual projects for the examples to introduce the construction technology of shallow pipe-jacking working shaft in details, including the construction key points like pre-grouting injection consolidation, ring beam construction method as well as reverse construction method.

Info:

Periodical:

Key Engineering Materials (Volumes 480-481)

Edited by:

Yanwen Wu

Pages:

1266-1270

DOI:

10.4028/www.scientific.net/KEM.480-481.1266

Citation:

L. Hui "Construction Technology of Shallow Pipe- Jacking Working Shaft", Key Engineering Materials, Vols. 480-481, pp. 1266-1270, 2011

Online since:

June 2011

Authors:

Export:

Price:

$35.00

In order to see related information, you need to Login.

In order to see related information, you need to Login.