Abstract:

Inspection well is needed for water drainage pipe jacking project in municipal engineering construction, and the deep ones are usually built by sunk tube method. According to a real project, this paper dissertates the construction technique of deep buried inspection well with sunk tube method under the condition of abundant water existence form the aspect of design theory and construction technique and emphasizes the problems and countermeasures during tube sinkage. The practice shows that inspection well with sunk tube method could resolve the difficulty of construction in Water-soaked Stratum.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 480-481)

Pages:

1283-1288

Citation:

Online since:

June 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Z.Y. Yang, H. Liu: Recent Status and Problems of Shallow Pipe-Jacking Works, Water Supply and Drainage, Vol33(2007), pp.107-108.

Google Scholar

[2] J.L. Yang H.X. Chen: Exploration of manhole pipe jacking works on the construction process, Trenchless Techmology, Vol. 22(2005), pp.98-100.

Google Scholar