Project Goal Balanced Optimization Research Based on Generalized Cost

Article Preview

Abstract:

Project’s duration - expense exchange question focus on how to optimize the goals by least expenses or by shortest duration limit for a project, and did not consider the influence of such optimization and incentive mechanisms for receipts and quality. This article first proposed the theory of generalized cost, brings the duration, the cost and the quality into line with the cost category, and constructed integrated optimization model of Duration, cost and quality based on the theory, with practical examples, the theory is proved feasibility, scientific and economic.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2966-2969

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Yu Wang, Zhongxiao Yu, Jun Li. Compositive optimization decisions about duration, quality and cost of project. JUECECANKAO[J].2006,(10): 42~43

Google Scholar

[2] Gang Zhang. High quality, low cost and reasonable duration-the fundamentality to the development of enterprise. Research on urban construction [J]. 2000,(1):33~34

Google Scholar

[3] Changhong Chen, Lan Li, Wensheng Song. The duration limit optimization analysis of constructive engineering project. Journal of Zhengzhou Institute of Aeronautical Industry Management[J].2003,21(3):84~85

Google Scholar

[4] Wen You, Lianyu Wei. Coordination and optimization of the engineering projects. Journal of Chongqing Jiaotong University[J].2003,22(2):113~116

Google Scholar