[1]
Bassioni H. A., Price A. D. F. and Hassan T. M. (2005). "Building a conceptual framework for measuring business performance in construction: an empirical evaluation." Construction Management and Economics, 23, 495–507.
DOI: 10.1080/0144619042000301401
Google Scholar
[2]
Bou-Llusar, J. C; Escrig-Tena, A. B.; Roca-Puig, V. and Beltran-Martin, I. (2009). "An empirical assessment of the EFQM Excellence Model: Evaluation as a TQM framework relative to the MBNQA Model." Journal of Operations Management, 27(1), 1-22.
DOI: 10.1016/j.jom.2008.04.001
Google Scholar
[3]
Calvo-Mora, A.; Leal, A. and Rolda´n, J.L., (2005). "Relationships between the EFQM Model Criteria: a study in Spanish Universities." Total Quality Management, 16 (6), 741–770.
DOI: 10.1080/14783360500077708
Google Scholar
[4]
Chan Albert P. C., Lam Patrick T. I., Chan Daniel W. M., Cheung Esther, Ke Yongjian, (2010). "Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective." Journal of Construction Engineering and Management, 136(5), 484-494
DOI: 10.1061/(asce)co.1943-7862.0000152
Google Scholar
[5]
Chinda, T. and Mohamed, S., (2007). "Causal relationships between enablers of construction safety culture", Proceedings of 4th international conference on construction in 21st century: Accelerating Innovation in Engineering, Management and Technology, Gold Coast, Australia.
Google Scholar
[6]
DeRuyter, K., Bloemer, J. and Peeters, P., (1997). "Merging service quality and service satisfaction an empirical test of an integrative model." Journal of Economic Psychology, 18, 387-406.
DOI: 10.1016/s0167-4870(97)00014-7
Google Scholar
[7]
Eskildsen, J.K., and Dahlgaard, J.J., (2000). "A causal model for employee satisfaction." Total Quality Management, 11 (8), 1081-1094.
DOI: 10.1080/095441200440340
Google Scholar
[8]
Federal Highway Administration (FHA) U.S., (2011). "Key Performance Indicators in Public-Private Partnerships." Available at: www.international.fhwa.dot.gov.
Google Scholar
[9]
Hampshire, J., (1999). "The Logical Framework Approach Guidelines." Material prepared as part of AusAid's Project Management Guidelines.
Google Scholar
[10]
Kagioglou, M., Cooper, R., and Aouad, G., (2001). "Performance management in construction: A conceptual framework." Constr. Manage. Econom., 19(1), 85–95.
DOI: 10.1080/01446190010003425
Google Scholar
[11]
KPI Working Group. (2000). "KPI Report for the Minister for Construction." Dept. of the Environment, Transport and the Regions, London.
Google Scholar
[12]
Kumaraswamy, M. M., and Thorpe, A., (1996). "Systematizing construction project evaluations." J. Manage. Eng., 12(1), 34–39.
DOI: 10.1061/(asce)0742-597x(1996)12:1(34)
Google Scholar
[13]
Li, B., Akintoye, A., Edwards, P. J., and Hardcastle, C., (2005). "Critical success factors for PPP/PFI projects in the UK construction industry." Constrt. Manage. Econom., 23, 459–471.
DOI: 10.1080/01446190500041537
Google Scholar
[14]
Lin Gongbo and Shen Qiping., (2007). "Measuring the Performance of Value Management Studies in Construction: Critical Review." Journal of Management in Engineering, 23(1), 2-9.
Google Scholar
[15]
NAO (National Audit Office), (2005). "Darent Valley Hospital: The PFI Contract in Action." Report of Comptroller and Auditor General, HC 209, Session 2004–5, The Stationery Office, London.
Google Scholar
[16]
Robinson Herbert S., Scott. Jon., (2009). "Service delivery and performance monitoring in PFI/PPP projects." Construction Management and Economics, 27, 181–197.
DOI: 10.1080/01446190802614163
Google Scholar
[17]
Robinson, L., (1999). "Scorekeepers to Business Partners: Repositioning the Finance Function." Total Quality Management, 10(4), 690-696.
DOI: 10.1080/0954412997703
Google Scholar
[18]
Sadeh, E., Arumugan,V., (2010). "Interrelationships among EFQM Excellence Criteria in Iranian Industrial SMEs." European of Economics, Finance and administrative Sciences, 19, 155-167.
Google Scholar
[19]
Sila, I., (2007). "Examining the effects of contextual factors on TQM and performance through the lens of organizational theories: An empirical study." Journal of Operational Management, 25, 83-109.
DOI: 10.1016/j.jom.2006.02.003
Google Scholar
[20]
Vijende, M., Gonzalez, L., (2007). "TQM and firms performance: An EFQM excellence model research based survey." International journal of business science and applied management, 2(2), 22-41.
Google Scholar
[21]
Watson, P., Seng, L.T., (2001). "Implementing the European Foundation for Quality Management Model in Construction." Construction Information Quarterly, 130, 1-8.
Google Scholar
[22]
Westerveld W., (2003). "The Project Excellence Model(R): linking success criteria and critical success factors." International Journal of Project Management, 21(6), 411-418.
DOI: 10.1016/s0263-7863(02)00112-6
Google Scholar
[23]
Yuan Jf, Zeng YJ, Skibniewski MJ, Li QM. (2009). "Selection of performance objectives and key performance indicators in public private partnership projects to achieve value for money." J Construct Manage Econ, 27(3):253-270.
DOI: 10.1080/01446190902748705
Google Scholar
[24]
ZHANG Xueqing, (2005). "Critical success factors for public private partnerships in infrastructure development." Journal of Construction Engineering and Management, 131(1) 3-14.
DOI: 10.1061/(asce)0733-9364(2005)131:1(3)
Google Scholar
[25]
Zade, E.A.; Safari, H.; Abdollahi, B.; Ghasemi, R., (2011). "Canonical Correlation Analysis between Enabler and Results in EFQM Model; A Case Study in TAVANIR Company in Iran." European Journal of Social Sciences, 21(3), 483-493.
Google Scholar