Research on Single Critical Resource-Constrained Multiple Projects Scheduling Problem Based on Critical Chain Method

Article Preview

Abstract:

In view of the characteristic of the Single Critical Resource-Constrained Multiple Projects Scheduling Problem, the paper first describes the SCRCMPSP, then establishes the model upon SCRCMPSP based on the Critical Chain Method and designs the corresponding arithmetic , at the same time it puts forward an Arithmetic flow for the Problem. In order to verify degree of adaptability of model and calculate way, the thesis selects a real examinations form the engineering in the related cultural heritage to carry on solving and analyses, it prove the model and calculate way's opposite to the traditional item progress' method is more valid.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2975-2978

Citation:

Online since:

May 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Antonio Lova, Pilar Tormos. Europen Journal of Operational Research. 2000, 408-424.

Google Scholar

[2] Antonio Lova.Pilar Tormos. Annals of Operations Research. 2001(102),263-286.

Google Scholar

[3] Willy Herroelen, Erik Demeulemeester ,Bert De Reyck. European Journal Operational Research. 2001(128), 679-688.

DOI: 10.1016/s0377-2217(99)00392-6

Google Scholar

[4] Herman Steyn. International Journal of Project Management.2000(19),363-369.

Google Scholar

[5] Izack Cohen,Avishai Mandelbaum,Avraham Shtub. Industrial Engineering and Management Technion Israel Institute of Technology.2003,39-50.

Google Scholar

[6] Herman Steyn. International Journal of Project Management. 2002:75-80.

Google Scholar

[7] Chiu_Chi Wei, Ping_Hung Liu and Yig_Chin Tsai. International Journal of Project Management. 2002(20),561-567.

Google Scholar

[8] Wan Wei, Cai Chen. Chinese Journal of Management Science. 2003 (10),4-8.

Google Scholar

[9] TOMÁŠŠUBRT http://fhi.euba.sk/ssov/VKOXI/.Subrt.pdf.256-262.

Google Scholar

[10] Tan Ye, Wei-jun Zhoug, Nan-rong Wu. Systems Engineering-Theory & Practice..2001(1),1 -5.

Google Scholar

[11] Gary E. Whitehous , Gall W. DePuy. Project Management Journal . 2001(12),24-31

Google Scholar

[12] Sonawane.Rohan.Applying system dynamics and critical chain methods to develop a modern construction project management system[D].United States-Texas,Texas A&M University-Kingsville, 2005.02,14-23.

Google Scholar