Integrated Production and Distribution Scheduling in Supply Chain Management

Article Preview

Abstract:

This paper studies multiple suppliers’ supply chain scheduling problem. A precise mathematical scheduling model is first built. Moreover, based on the optimal condition analysis, one problem related to the objectives of minimize the number of tardy jobs has been investigated. Furthermore, the corresponding dynamic programming method has been presented. These algorithm has been proved to be efficient by showing its pseudo-polynomial complexity.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

399-403

Citation:

Online since:

June 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Thomas. D.J., P.M. Griffin, Coordinated supply chain management, European Journal of Operations Research, 94(1996): 1-15.

Google Scholar

[2] Sarmiento, A. M., R. Nagi. A review of integrated analysis of production distribution systems. IIE Trans. 1999, 31:1061-1074.

DOI: 10.1080/07408179908969907

Google Scholar

[3] Erengüc, S., S., N. C. Simpson, A. J. Vakharia. Integrated production/distribution planning in supply chains. Eur. J. Oper. Res. 1999, 115: 219-236.

Google Scholar

[4] Hall, N. G., C. N. Potts. Supply chain scheduling: Batching and delivery. Operations Research. 2003, 51:566-584.

DOI: 10.1287/opre.51.4.566.16106

Google Scholar

[5] Hall N.G., M. Lesaoana, C.N. Potts. Scheduling with fixed delivery dates. Oper. Res. 2001, 49: 134-144.

DOI: 10.1287/opre.49.1.134.11192

Google Scholar

[6] Li,C.L., G. Vairaktarakis, C.Y. Lee. Machine scheduling with deliveries to multiple customer locations. Eur. J. Oper. Res. 2005, 164: 39-51.

DOI: 10.1016/j.ejor.2003.11.022

Google Scholar

[7] Ahmadi J.H., R.H. Ahmadi, S. Dasu and C.S. Tang, Batching and scheduling jobs on batch and discrete processors, Operations Research., 39 (1992): 750-763.

DOI: 10.1287/opre.40.4.750

Google Scholar

[8] Lenstra J.K., A.H.G. Rinnooy Kan and P. Brucker, Complexity of machine scheduling problems, Naval Research Logistics, 1 (1977): 343-362.

DOI: 10.1016/s0167-5060(08)70743-x

Google Scholar