Study on Adjustment of Prime Cost Sum in Cost Control of Engineering Project

Article Preview

Abstract:

The controversy over the content of adjustment on prime cost sum of engineering project was summarized. The payment subject was rationally analyzed first as the basis for adjustment subsequently. Then the adjustment content was illustrated by the stage of transaction and construction respectively. At last this paper gives detailed adjustment process and advice for adjustment of the prime cost sum and its payment.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2199-2204

Citation:

Online since:

July 2014

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Wenliang Wu. Management of prime cost sum under the bill of qualities pricing Method[J]. China Construction Education, 2011, Z4: 76-78+94.

Google Scholar

[2] Jun Feng. Whether the prime cost sum can be adjusted freely [J]. China Tendering Weekly, 2013, 38: 20-21.

Google Scholar

[3] Hui Su. Analysis on the defect of prime cost sum [J]. Construction Economy, 2009, 04: 87-88.

Google Scholar

[4] Feng Zhou. Full-aspect of prime cost sum [J]. China Tendering Weekly, 2012, 16: 36-43.

Google Scholar

[5] Hongjuan Li. The application of prime cost sum on engineering management. Construction Economy, 2012, 02: 72-73.

Google Scholar