Comprehensive Evaluation Model of Resource Allocation for Construction Programme

Article Preview

Abstract:

According to the characteristics of resource allocation for engineering construction programme, the comprehensive evaluation model of resource allocation rationality for programme is established with the combination of analytic hierarchy process and fuzzy comprehensive evaluation method. The rationality of resource allocation for programme is evaluated objectively based on the assessment of correlation degree between monomer project and the programme and the evaluation of resource allocation rationality for monomer projects. And the evaluation results have been analyzed and sorted through the principle of weighted average.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2215-2219

Citation:

Online since:

July 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Zhaoyong Zhang, Xueqing Wu, Zhuofu Wang, Project management of engineering construction company : an implementation model, Construction Economy (2008), pp.101-105, In Chinese.

Google Scholar

[2] Xiaobao Zhou, Research and application of resource scheduling model under the management of programme, Wuhan University of Science and Technology (2011), In Chinese.

Google Scholar

[3] Chunxiu Wang, Research on application of AHP- fuzzy comprehensive evaluation method in job and performance. North China Electric Power University (2005), In Chinese.

Google Scholar

[4] Yukun Huang, Xinyuan Cui, Fuzzy comprehensive evaluation model of resource allocation for construction project, Shanxi Building (2005), pp.6-7, In Chinese.

Google Scholar

[5] Min Song, Houli Fu, Comprehensive evaluation model of existing building energy saving. Construction Economy(2012), pp.84-87, In Chinese.

Google Scholar