Construction of Temporary Accommodation Camp and Selection of Optimal Type of Building

Article Preview

Abstract:

Surveys performed nationwide show that mobile temporary accommodation camps are being manufactured by more than 200 specialized enterprises (without considering the minor manufacturers) acting under different ministries and agencies. According to the analysis performed, today 26 basic mobile structural systems consisting of 18 conveyor-type and 8 demountable-type systems are being used on a national basis. Today national manufacturers are producing more than 250 types of container-type buildings and facilities which differ in functionality, capacity, climatic category, price and other technical-and-economic indexes. Use of mobile accommodation complexes is characterized by certain advantages. Basic criterion for mobile accommodation camp construction consists in its timely commissioning. Basic predicted indexes affecting the cost of temporary accommodation camp could serve as an endorsement of the forwarded standpoint.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

105-110

Citation:

Online since:

January 2015

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2015 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Birjukov, A.N., Bulanov, A. Strategiya razvitiya stroitelnogo predpriyatiya v sovremennykh usloviyakh [Strategy of construction enterprise development under current conditions] (2004) St. Petersburg, VITU, p.204. (rus).

Google Scholar

[2] Birjukov, A.N., Vasiliev, V.M. Organizatsiya vosstanovleniya i stroitelstva obyektov pri likvidatsii posledstviy chrezvychaynykh situatsiy [Organization of buildings rehabilitation and construction in the course of emergency consequences rectification] (2000).

Google Scholar

[3] Birjukov, A.N., Semenchenko, A.V. Vybor faktorov i pokazateley, vliyayushchikh na organizatsiyu vosstanovitelnogo stroitelstva s ispolzovaniyem mobilnykh podrazdeleniy [Selection of factors and features affecting organization of rehabilitation construction activities performed with the use of mobile units] (2011).

Google Scholar

[4] Bolotin S., Birjukov, A. Time Management in Drafting Probability Schedules for Construction Work (2013) World Applied Sciences Journal, 23, p.01–04.

Google Scholar

[5] Birjukov, A.N. The military-economic mechanism of the choice of the concept of restoration and building of objects at liquidation of consequences of emergency situations (2012).

Google Scholar

[6] Heiberg, E.R. Engineer missions. Support the Total Army (1995) The Military Engineer, No. 498, p.7–10.

Google Scholar

[7] Hikosaka, Y. Temporaries and Catastrophic Environment (2006) Japan Architect, 374, p.60–67.

Google Scholar

[8] Newman, J.R. Mobil-bau-Container fur Baystellen in In und Ausland (2010) Bumashinendienst, 40 p.

Google Scholar

[9] Pritskar, А.В., Whitehouse, G.E. Graphical Evaluation and Review Technique. Part I: Fundamentals; Part II: Probabilistic and Industrial Engineering Applications (1966) Journal of Industrial Engineering, XVII, No. 5 and 6, рр. 124–130.

Google Scholar

[10] Helfert, E.A. Techniques of Financial Analisis (1991) Seventh Edition, Boston: Richard D. Irwin, INC., 512 p.

Google Scholar

[11] Khan, M.Y., Jain, P.K. Financial Management. Text and Problems (1992) Second Edition, New Delhi: Tata MсGraw-Hill Publishing Company Limited, 787 p.

Google Scholar

[12] Coaldrake, W.H. Manufactured Housing – the New Japanese Vernacular (1986) Japan Architect, No. 353, рр. 60–65.

Google Scholar

[13] Bottcher, J., Drexl, A., Salewski, F. Project scheduling under partially renewable resource constraints (1999) Management Science, Vol. 45, рр. 543–559.

DOI: 10.1287/mnsc.45.4.543

Google Scholar

[14] Chinwah, J.G. Shear strength of Brick-Walls, Progress Research (1968) JGE, Portsmouth College of Technology, England, рp. 47–48.

Google Scholar

[15] Icmeli, О., Erenguc, S.S. A branch and bound procedure for the resource constrained project scheduling problem with discounted cash Cows (1996) Management Science, Vol. 42, No. 10, рр. 1395–1408.

DOI: 10.1287/mnsc.42.10.1395

Google Scholar

[16] Kolish, R., Padman, R. An Integrated Survey of Deterministic Project Scheduling (2001) OMEGA Journal of Sched., Vol. 29, рp. 249–272.

DOI: 10.1016/s0305-0483(00)00046-3

Google Scholar

[17] Laudon, K.C., Laudon, J.P. Management information systems. New approaches to organization and technology (1998) New York: Prentic Hall International, Inc., 693 p.

Google Scholar