FEM Analysis of an Amphibious Hydraulic Excavator’s Boom and Stick

Article Preview

Abstract:

Force conducted to boom and stick is analyzed by complicated elements divide of FEM, it shows that the more the box section is, the more load is, and Hinge point’s force is much more than before. If size isn’t be affected, it can be reduced by increasing the sectional area. FEM analysis and design comparison analysis results show that FEM analysis method is feasible to amphibious hydraulic excavator. FEM analysis of results to practical design provides a practical way and means for the process of other construction machinery design analysis.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

336-339

Citation:

Online since:

March 2011

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] D. W. Kong, K. L. Zhao: Hydraulic Excavator. (Chemistry Industry Press, Beijing, 2007).

Google Scholar

[2] M. L. Zhou: Machinery Products and Science & Technique, (1997), pp.2127-2130.

Google Scholar

[3] S. Yu, J. Z. Zhang: Construction Machinery, (2002), pp.8-10.

Google Scholar

[4] S. H. Cao, H. Yu: Single Dipper Hydraulic Excavator. (Chinese Architecture Industry Press, Beijing, 1986).

Google Scholar

[5] Q. S. Fan, Y. J. Yin: Materials Mechanicals. (Tsinghua University Press, Beijing 2004).

Google Scholar

[6] K. Liu: ANSYS FEM Concise Explanation. (Defense Industry Press, Beijing, 2005).

Google Scholar

[7] F. C. Wang, C. H. Zhang: ANSYS10. 0 FEM Analysis and Application in Engineering. (Electronic Industry Press, Beijing, 2006).

Google Scholar