The Influence of Basin Excavation on the Sheet Pile Structure

Article Preview

Abstract:

In this paper, the basin excavation process is numerically simulated by using the geotechnical engineering software PLAXIS, and the bending moment, deformation and anchor bar tension of sheet piles under different excavation methods are obtained. The influence in different basin excavation methods on internal force and deformation of the sheet pile is studied by the non-linear finite element method. The results show that, if the construction process was piling before excavation, the maximum bending moment at mid-span, the maximum bending moment in buried section, the maximum horizontal displacement and anchor bar tension of the sheet piles would be bigger than the results without considering the influence of basin excavation. Therefore, the influence of basin excavation sequence should be seriously taken into account in the sheet pile design and construction.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 250-253)

Pages:

2818-2823

Citation:

Online since:

May 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Vickburg MS: U.S. Army Engineer Waterways Experiment Station, 1992.

Google Scholar

[2] Vaziri H H: Canadian Geotechnical Journal, 290-308(3), 1996.

Google Scholar

[3] Tan Y: Canadian Geotechnical Journal, 147-160(2), 2008.

Google Scholar

[4] Tanb Y: Computer and Geotechnical Journal, 902-910(36),2009.

Google Scholar

[5] The sheet pile wharf code for design and construction of JTS-3-2009, China·P·R

Google Scholar

[6] Shilin Li, Guangming Xu: Hydro-Science and Engineering, 439-72(11), 2008.

Google Scholar

[6] Zhangpei Pei, Yunqiu Wang: Port & waterway engineering, 6-9(11), 1998.

Google Scholar

[7] Liuyong Xiu andYuanyin Li: Journal of port engineering, 37-40(12), 2005.

Google Scholar