A Production Planning and Scheduling Architecture for Networked-Manufacturing System Based on Available-to-Promise

Article Preview

Abstract:

In the practical application of push-pull based production planning and scheduling architecture, the manufacturing system was found lacking of collaborative mechanism, especially for a networked-manufacturing environment, which requires each individual manufacturer interact and cooperate with each other for a collaborative manufacturing. This paper presents a production planning and scheduling architecture for networked-manufacturing system based on available-to-promise, which can effectively merge forecast-driven production activity with order-driven production activity, thus ensures the steady and prompt supply of material, and also cooperation and mutual benefit of individual manufacturer. This architecture consists of 1) an ATP-based order management and decision-making system, 2) a push-pull based multi-plant master production schedule collaboration model, 3) a pre-reactive collaborative replenishment model, 4) a production scheduling model of unrelated parallel machine and 5) the corresponding production planning and scheduling methods for each model. By combining the concept of ATP, this architecture can not only provide resource planning for networked-manufacturing system, but also offer quick response and promise to customer requests.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 268-270)

Pages:

292-296

Citation:

Online since:

July 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Brussel, H. Van: Holonic manufacturing systems, the vision matching the problem, Proceedings of the 1st European Conference on Holonic Manufacturing Systems (Hannover, Germany 1994).

Google Scholar

[2] Okino: N. Bionic Manufacturing System. Manufacturing Systems (1994), pp.73-95.

Google Scholar

[3] C.Y. Chen, Z.Y. Zhao, M.O. Ball: Quantity and due date quoting Available-to-Promise. Information Systems Frontiers, Third Quarter, (2001), pp.477-488.

Google Scholar

[4] S.G. Taylor, G.J. Plenert: Finite capacity promising, Production and Inventory Management Journal, Third Quarter, (1999), pp.50-56.

Google Scholar

[5] R. Hariharan, P. Zipkin: Customer-order information, lead times, and inventories. Management Science; Vol. 41 (1995), p.1599–1607.

DOI: 10.1287/mnsc.41.10.1599

Google Scholar

[6] C.Y. Chen, Z. ZHAO, M.O. Ball: A model for batch advanced available-to-promise. Production & Operation Manage Vol. 11 (2002), pp.424-440.

Google Scholar