Simulation and Study of Random Loads on Continuous Miner Cutting Drum

Article Preview

Abstract:

In order to study characteristics of loads on a cutting drum of a continuous miner, a mathematic model of random loads on the drum is set up in the paper by means of defining probability distributions of three-direction loads, loads and their variations on a cutting drum are given by building a computer simulation program when it cuts pure coal, rock and hard parcel. Results show that swing resistance is the greatest, forward resistance is the second, axial resistance is the least; a cutting resistance torque increases with the increase of broken media strength; loads cut stone layer are much larger than pure coal; range of load change and load fluctuations are big as cutting hard parcel, these conclusions are correspond with the actual situation.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 308-310)

Pages:

1885-1888

Citation:

Online since:

August 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Xiaohguo Li, Xiaohng Ma. Visual simulation study of pick load on continuous miner. Key Engineering Materials, Vol. 392~394 (2009), pp.471-475.

DOI: 10.4028/www.scientific.net/kem.392-394.471

Google Scholar

[2] Yanli Chao, Xiaohuo Li, Yongdong Sha and Hongmei Liu. Analysis on cutting ability of picks on continuous miner. Advanced Materials Research, Vol.97-101(2010), pp.4470-4473.

DOI: 10.4028/www.scientific.net/amr.97-101.4470

Google Scholar

[3] Xiaohuo Li, Mingjie Wo, Ting Li, Jiwen Guo. Correlation analysis of pick loads on cutting chain of continuous miner. 2010 International Conference on Engineering Computation. London Science Publishing, September (2010), pp.123-126 (In China).

Google Scholar

[4] Xiaohuo Li, Xiaohong Ma, Xinwei Yu. Simulation study on the effect of kinematical parameters of continuous miner upon loads of cutting mechanism. Journal of Guangxi University (Natural Science Edition), Vol. 35(2010) No.6, pp.967-971 (In China).朗读 显示对应的拉丁字符的拼音 字典 - 查看字典详细内容

DOI: 10.3788/yjyxs20153006.1045

Google Scholar

[5] Xiaohuo Li, Huaiting Ge. Mathmatical model of stochastic pick loads for a continuous miner. Chinese Journal of Construction Machinery, Vol. 4 (2006) No.3, pp.262-264 (In China).

Google Scholar

[6] Xiaohuo Li, Xinwei Yu. Simulation and study of hard parcel distribution on continuous miner coalface. World Sci-Tech R&D, Vol.31 (2009) No.3, pp.423-424,422 (In China).

Google Scholar

[7] R.M. Miser, K.D. Beck, W.Ramer. Operational experience with a 30 M2 continuous miner at Wabash mine. Coal International, Vol.251(2003) No.5, pp.242-245.

Google Scholar

[8] V.B. Achanti, A.W. Khair. Cutting efficiency through optimized bit configuration-an experimental study using a simulated continuous miner. Mineral Resources Engineering, Vol.10(2001) No.4, pp.427-434.

DOI: 10.1142/s0950609801000737

Google Scholar