Study on the Insulation Coordination of ±800kV Converter Station in the Nuozhadu to Guangdong HVDC Power Transmission Project

Abstract:

Article Preview

It is very important to study the overvoltage protection and insulation coordination of the converter stations for the ±800kV UHVDC transmission project because of its importance in the power grid. The paper studies two kinds of arrester arrangements of the converter stations in the Nuozhadu to Guangdong ±800kV UHVDC power transmission project by using the PSCAD/EMTDC program. The simulation results show that the protective level of arresters is different, while the insulation levels of critical equipments in the converter station are almost the same under these two arrester arrangement schemes.

Info:

Periodical:

Advanced Materials Research (Volumes 354-355)

Edited by:

Hao Zhang, Yang Fu and Zhong Tang

Pages:

1205-1209

DOI:

10.4028/www.scientific.net/AMR.354-355.1205

Citation:

Y. X. Han and Y. X. Lu, "Study on the Insulation Coordination of ±800kV Converter Station in the Nuozhadu to Guangdong HVDC Power Transmission Project", Advanced Materials Research, Vols. 354-355, pp. 1205-1209, 2012

Online since:

October 2011

Export:

Price:

$35.00

[1] Peihong. ZHOU, Muhong. XIU, Dingxie. GU, Min. DING, Ying. LOU . Study on overvoltage protection and insulation coordination for ±800kV HVDC transmission system, [J]. High Voltage Engineering, vol. 32(12), pp.125-132, 2006 (in Chinese).

DOI: 10.1109/pes.2010.5589961

[2] Dingzhen. NIE, Weimin. MA, Ming. LI. Insulation coordination for converter stations of UHVDC project from Jinping to Sunan, [J]. High Voltage Engineering, vol. 36(1), pp.92-97, 2010 (in Chinese).

[3] Zhenya. LIU. Overvoltage and insulation coordination of the UHVDC transmission power system, [M]. Beijing. Electric Power, 2009 (in Chinese).

[4] Technology Research Center of China Southern Power Grid. Study report of Nuozhadu to Guangdong ±800kV DC transmission project in tender stage,. 2010(in Chinese).

[5] Technology Research Center of China Southern Power Grid. Yunnan -Guangdong ±800kV DC transmission project DC protection and DC filter protection study report, [R]. Guangzhou,Technology Research Center of China Southern Power Grid. ,2005 (in Chinese).

[6] Yongxia. HAN, Yuxin. LU, Huixiang. CHEN and Licheng. LI. Simulation analysis on lightning intruding overvoltage of the ±800kV converter station,. High Voltage Engineering, Vol. 36, No. 1, pp.218-223. 2010 (in Chinese).

DOI: 10.1109/appeec.2011.5748736

[7] Yongxia. HAN, Huixiang. CHEN, Yuxin. LU and Licheng. LI. Research on DC transient overvolatge and insulation coordination of ±800kV converter station,. Asia-Pacific Power and Energy Engineering Conference (APPEEC 2011), WuHan China, March, 2011. pp.1-4.

DOI: 10.1109/appeec.2011.5748736

[8] M. Szechtman, T. Wess, C.V. Thio. First benchmark model for HVDC control studies,. Eletra, vol. 135, pp.54-73, (1991).

[9] M. Szechtman, T. Wess, C.V. Thio. A benchmark model for HVDC system studies,. International conferrance on ac and dc power transmission, pp, 374-378, (1991).

[10] Technology Research Center of China Southern Power Grid. Yunnan -Guangdong ±800kV DC transmission project DC protection and DC filter protection study report, [R]. Guangzhou,Technology Research Center of China Southern Power Grid. 2005 (in Chinese).

In order to see related information, you need to Login.