Research and Application of Web-Based 3D Visualization of Monitoring over Materials Haulage to Dam

Article Preview

Abstract:

The aim of web-based 3D visualization of monitoring over materials haulage to rock-fill dam is to achieve 3D visual expression on internet for transporting vehicles and the surroundings, which is hydropower project construction site layout. On the basis of analysis on 3D visualization process based on 3DS MAX and principles of web-based 3D visualization based on ActiveX technology, the implementation scheme of web-based 3D visualization of monitoring over materials haulage to dam is designed and its implementation methods are analyzed in detail. The real-time motoring and analysis system of materials haulage to rock-fill dam with network, digitalization and visualization, which is developed in B/S architecture, provides supports to engineering construction management.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 433-440)

Pages:

6770-6775

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Zhong DengHua, Cui Bo, Liu DongHai and Tong Dawei, Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam, Science in China Series E-Technological Science, vol. 52, Nov. 2009, pp.3406-3412.

DOI: 10.1007/s11431-009-0343-6

Google Scholar

[2] Zhong Denghua and Song yang, Study on 3D visual graphic simulation method and application for hydraulic and hydropower engineering construction based on GIS (in Chinese), Journal of Engineering Graphics, vol. 25, Mar. 2004, pp.52-58.

Google Scholar

[3] Zhu Huirong and Zhong Denghua, Study on three-demension visualization digital model for construction site layout (in Chinese), Computer Engineering and Design, vol. 25, Jul. 2004, pp.1049-1052.

Google Scholar

[4] Zhong Denghua, Guo Xiang and Song Yang, Three-dimensional graphics modeling for construction site layout of hydroelectric engineering (in Chinese), Journal of Engineering Graphics, vol. 26, Oct. 2005, pp.45-50.

Google Scholar

[5] Gu Qinghua, Lu Caiwu, Li Faben and Wan Changyong, Monitoring dispatch information system of trucks and shovels in an open pit based on GIS/GPS/GPRS, Journal of China University of Mining and Technology, vol. 18, Jun. 2008, pp.288-292.

DOI: 10.1016/s1006-1266(08)60061-9

Google Scholar

[6] GU Qinghua, LU Caiwu, GUO Jinping and Jing Shigun, Dynamic management system of ore blending in an open pit mine based on GIS/GPS/GPRS, Mining Science and Technology, vol. 20, Jan. 2010, pp.132-137, doi: 10. 1016/S1674-5264(09)60174-5.

DOI: 10.1016/s1674-5264(09)60174-5

Google Scholar

[7] SUN Enji, NIETO Antonio and LI Zhongxue, GPS and Google Earth based 3D assisted driving system for trucks in surface mines, Mining Science and Technology, vol. 20, Jan. 2010, pp.138-142, doi: 10. 1016/S1674-5264(09)60175-7.

DOI: 10.1016/s1674-5264(09)60175-7

Google Scholar

[8] Carlos Amiama, Javier Bueno, Carlos Jose Allvarez and Jose Manuel Pereira, Design and field test of an automatic data acquisition system in a self-propelled forage harvester, Computers and Electronics in Agriculture, vol. 61, May. 2008, pp.192-200.

DOI: 10.1016/j.compag.2007.11.006

Google Scholar

[9] N. Murakamia, A. Itoa, Jeffrey D. Will, Michael Steffenb, K. Inouea, K. Kitaa, et al., Development of a teleoperation system for agricultural vehicles, Computers and Electronics in Agriculture, vol. 63, Aug. 2008, pp.81-88.

Google Scholar

[10] Lalit Kane , Bhupendra Verma and Sanjeev Jain, Vehicle tracking in public transport domain and associated spatio-temporal query processing, Computer Communications, vol. 31, Jul. 2008, pp.2862-2869.

DOI: 10.1016/j.comcom.2007.12.020

Google Scholar