A Mathematic Model for Cyclic Scheduling in Robotic Cell of Molds Manufacture Processing Multiple Piece Types

Article Preview

Abstract:

This paper considers the cyclic scheduling problem in robotic cell of molds manufacture processing multiple piece types. The objective is minimizing the cycle time. A mathematical model for the scheduling problem is established, the sequencing of pieces and robot moves are combined them naturally in this practical area. At last, the probable algorithm and experiment are proposed.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 468-471)

Pages:

135-138

Citation:

Online since:

February 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] N.Geismar, M. Dawande, C.Sriskandarajah, IEEE transactions on automation science and engineering 8(1), 29-41. (2011)

Google Scholar

[2] C. R. Asfahl, Robots and Manufacturing Automation. New York:Wiley, 1992.

Google Scholar

[3] M. P. Groover, Automation, Production Systems, and Computer Integrated Manufacturing. Englewood Cliffs, NJ: Prentice-Hall, 1987.

Google Scholar

[4] S.P. Sethi, C. Sriskandarajah, G. Sorger, J. Blazewicz, W. Kubiak. International Journal of Flexible Manufacturing Systems, 4 : 331-358, (1992)

DOI: 10.1007/bf01324886

Google Scholar

[5] R. Logendran, C. Sriskandarajah. International Journal of production research,Vol.34, No.12, 3447-3463. (1996)

Google Scholar

[6] C. Sriskandarajah, I. Drobouchevitch, S.P. Sethi, R. Chandrasekaran, Operations research, Vol. 52, No. 1, p.65–82 (2004)

Google Scholar

[7] Y. yunjun, N. Xiaodong, and C. xindu : submitted to European Journal of Operational Research (2011)

Google Scholar