One-Piece Flow Implementation Research in the Garment Enterprises

Article Preview

Abstract:

One-piece flow is one of the effective tools of lean production. Many garment enterprises expect to implement it in their own enterprises, but a lot of difficulties exist in the implementation process. In this paper, it takes an example of a well-known processing enterprise and to study the one-piece flow implementation process of a pair of jeans pipeline. By nearly a year of tracking and research, the paper systematically summarizes the pre-production preparation and production maintenance in the implementation of the One-piece flow. It demonstrates in detail on how to achieve the improvement of the hardware, software and personnel in order to reach the requirement of one-piece flow. Then, it systematically discusses the wage system of one-piece flow and will provide a theoretical and practical basis for the implementation of a single-piece flow production.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 655-657)

Pages:

2352-2357

Citation:

Online since:

January 2013

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ning Ye. Single Piece Flow Production Applications in Garment Enterprises [J]. Textile Science . 2008 (37) : 46 – 48, In Chinese.

Google Scholar

[2] Songyan Chen. One piece flow boost lean production [J]. Textile and Apparel Weekly, 2010 (12) : 66-67, In Chinese.

Google Scholar

[3] Tianming Gu, clothing single piece flow, ideal and reality [J]. Garment, In Chinese.

Google Scholar

[4] Xiaoli Ye. clothing single piece flow, production research [J]. The Jiangsu Textile, 2009 (02) : 56-57, In Chinese.

Google Scholar

[5] Lincoln Electric.One Piece Flow, Material Handling Management,2006.

Google Scholar

[6] Pingyu Yang.Barriers and Solutions to SMEs in the implementation of lean production [J]. Reform strategy . 2009 (11) : 148-151, In Chinese.

Google Scholar

[7] Lei Yang,Xiaopeng Zhang,Mingyue Jiang. An Optimal Kanban System in a Multi-Stage,Mixed-model Assembly Line[J]. J Syst Sci Syst Eng 2010(19): 036-049.

DOI: 10.1007/s11518-009-5114-1

Google Scholar