The Total Life-Cycle Risk Assessment of a Harbor Highway BT Project

Abstract:

Article Preview

This article focuses on the method of assessment of the risks in the construction process of Highway BT projects. This paper makes the risk assessment to a harbor Highway BT project, by building the risk assessment system based on the total life-cycle model. The risk assessment to the project is divided into four phases, which are initiated, contract, construction, and repurchase. And through the surveys of experts, we collect the data, determine the weights with Rough Set theory, and analyze the risks of the project. Finally, we get the result on the assessment for the risks of the project, it is a good indication of the actual risk of the project.

Info:

Periodical:

Advanced Materials Research (Volumes 671-674)

Edited by:

Yong Huang, Tai Bao and Hong Wang

Pages:

3059-3064

DOI:

10.4028/www.scientific.net/AMR.671-674.3059

Citation:

C. Y. Liu and M. Z. Li, "The Total Life-Cycle Risk Assessment of a Harbor Highway BT Project", Advanced Materials Research, Vols. 671-674, pp. 3059-3064, 2013

Online since:

March 2013

Export:

Price:

$35.00

[1] Ward. chapman: International Journal of Project Management. Forum Vol. 21 (2003), pp.98-104.

[2] Akintola S Akintoye: International Journal of Project Management. Forum Vol. 19 (2001), p.207.

[3] Aven,Kerte: Reliability Engineering and System Safety. Forum Vol. 79 (2003), p.208.

[4] David B. Hertz,Howard Thomas: Risk Analysis and its Application. USA,(1983).

[5] Pawlak Z: International Journal of Information and Computer Science. (1982), pp.341-356.

[6] Pawlak Z: European Journal of operational research. (1997), pp.48-57.

[7] Lijuan Chen: East China Highway. Forum Vol. 181 (2010), pp.84-85.

In order to see related information, you need to Login.