Advanced Materials Research
Vol. 764
Vol. 764
Advanced Materials Research
Vol. 763
Vol. 763
Advanced Materials Research
Vols. 760-762
Vols. 760-762
Advanced Materials Research
Vols. 756-759
Vols. 756-759
Advanced Materials Research
Vols. 753-755
Vols. 753-755
Advanced Materials Research
Vols. 750-752
Vols. 750-752
Advanced Materials Research
Vol. 749
Vol. 749
Advanced Materials Research
Vol. 748
Vol. 748
Advanced Materials Research
Vol. 747
Vol. 747
Advanced Materials Research
Vol. 746
Vol. 746
Advanced Materials Research
Vol. 745
Vol. 745
Advanced Materials Research
Vol. 744
Vol. 744
Advanced Materials Research
Vol. 743
Vol. 743
Advanced Materials Research Vol. 749
Paper Title Page
Abstract: Warehouse management is an important content in the electric energy measuring center standardization construction and a very important part in the full life cycle management of electrical energy measuring instruments. By introducing intelligent warehousing technology, a kind of standardized work flows was proposed based on the production characteristics of the instruments. It combines with the advantages which are high degree of automation and highly integrated. The work flow specificities the new share energy meter storage process, energy meter of storage processes for Verification, as well as distribution warehousing processes. The overall architecture of Energy Metering Centre production scheduling platform was proposed which divided into field equipment layer, monitoring and management layer, production scheduling layer. The design of the layers were introduced.
634
Abstract: There are 220kV super-voltage transmission lines and electrification line above the road-cut excavation blasting project, which is near the buildings, the blasting vibration and fly-rocks shall be strictly controlled, thus the blasting design and construction are difficult. This paper describes the controllable blasting technology design of the road-cut excavation in the complex environment, the blasting parameter selection, the detonating network and the safety technology. Practice has proved that the blasting vibration and individual fly-rock can be controlled by the meticulous design and construction as well as reliable safety technology measures under the condition of no cover when urban road-cut excavation blasting is carried out in the complex environment.
641