p.4193
p.4198
p.4203
p.4207
p.4212
p.4217
p.4221
p.4225
p.4229
Reason Analysis and Solution of the 220kV Breaker's Malfunction in Synchronous Parallel Operation
Abstract:
This paper briefly describes the principle and procedure of the synchronized operation of the breaker. The cause of the unavailability of manual operation of the bus-tie breaker at a 220 kV substation is identified and a solution is found. The onsite test results show that the proposed solution is effective which enhances the stability of the power grid.
Info:
Periodical:
Pages:
4212-4216
Citation:
Online since:
September 2013
Authors:
Price:
Сopyright:
© 2013 Trans Tech Publications Ltd. All Rights Reserved
Share:
Citation: