Lightning Protection Research and Simulation of High-Speed Railway Catenary

Article Preview

Abstract:

The existing high-speed railway in China is erected on the viaduct. The traction power supply system of high-speed railway consists of catenary with auto-transformer (AT). The catenary above the rails is supported by towers besides the rails. As the increase of the height from top of towers to ground, the probability of the pilot discharging of lightning to catenary will increase. And the pilot striking distance to ground always remains constant. So the horizons shielding effects for catenary will decrese, and the whole catenary naked in the atmosphere extremely easily struck by thunderbolt. In the important places, e.g., substation and areas of frequent lightning, the lightning arrester is installed to limit lightning overvoltage. But the lightning arrester can limit local overvoltage only. In fact, high-speed railway struck by lightning has affected the safety of power supply system in China. So more reasonable lightning protection measures for Chinas high-speed railway will be studied in this paper.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 875-877)

Pages:

1707-1711

Citation:

Online since:

February 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] YU Zeng. Study on lightning protection of catenary[J]. Journal of Railway Engineering Society, 2002(1), in Chinese.

Google Scholar

[2] Zheng Shuhui, Liu Zhenhua, Sun Jinbing. Lightning disturbance analysis and Lighting Protection of Datong-Qinhuangdao line catenary [J]. Railway Standard Design, 2008, (6), in Chinese.

Google Scholar

[3] The ministry of railways of the people's republic of China. TBl0009-2005 design code of railway electric traction feeding [s]. Beijing: China Railway Publishing House, 2005, in Chinese.

Google Scholar

[4] LI Ruhu. Research on shielding effectiveness of lightning conductor[J]. East China Electric Power, 1987(12), in Chinese.

Google Scholar

[5] Zhai Tiejiu. Analysis of traction power supply system of the lightning protection[J]. Railway Standard Design, 2003, (12) , in Chinese.

Google Scholar

[6] ZHAo Zihuil, WU Guangnin, CAO Xiaobin, LI Ruifan, HU Jinson, ZHU Junl. EGM based calculation method for the installation height of catenary ground wire[J]. China railway science, 2011, 32(6), in Chinese.

Google Scholar

[7] Zhang Xueyuan, Wu guangning, Wang Wangang. Lightning over-voltage high-speed railway catenary[A]. Doctoral Forum of Electrical Engineering in China, 2008, in Chinese.

Google Scholar