Finite Capacity Planning for Multiple TFT-LCD Color Filter Fabs

Article Preview

Abstract:

A Finite Capacity Planning Policy (FCPP) is developed for multiple color filter (CF) fabs where each fab has several identical production lines. FCPP assigns customer orders to multiple fabs and multiple lines by taking into account each fab’s available capacity and Work-In-Process (WIP) level, as well as each order’s batch size, product type, process routing, and processing time. After all orders are assigned to fabs and lines, order release time and finish time are determined by the implementation of several modules. FCPP is developed in Microsoft Visual Basic for Application (VBA), and an AutoMod simulation model is also developed. A company with two CF fabs and two lines at each fab is treated as a case study, and industrial data from these fabs are collected and used to evaluate the performance of FCPP based on the design of experiments. Preliminary simulation results show that FCPP can effectively and efficiently balance the loading between fabs and also balance the loading between lines in each fab.

You might also be interested in these eBooks

Info:

Periodical:

Key Engineering Materials (Volumes 419-420)

Pages:

637-640

Citation:

Online since:

October 2009

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2010 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, and M. T. Chiang, Effective Order Release and Dispatching for Color Filter Fabs, Society for Information Display International Symposium, San Antonio, Texas, USA (2009).

DOI: 10.1889/1.3256538

Google Scholar

[2] J. C. Chen, C. C. Chen, C. N. Mo, T. W. Peng, G. C. Chao, C. J. Sun, K. J. Chao, J. W. Chien, Y. Y. Wei, C. H. Feng, Y. C. Liu, M. T. Chiang, Infinite Capacity Planning for Color Filter Fabs, International Display Manufacturing Conference, Taipei, Taiwan (2009).

DOI: 10.1889/1.3256538

Google Scholar

[3] J. C. Chen, Y. C. Fan, and C. W. Chen, Capacity Requirements Planning for Twin Fabs of Wafer Fabrication, International Journal of Production Research (2008), First Published on 30 April (2008).

DOI: 10.1080/00207540802007597

Google Scholar

[4] J. T. Lin, F. K. Wang, and C. C. Peng, Lot release times and dispatching rule for a TFT-LCD cell process, Robotics and Computer-Integrated Manufacturing, Vol. 24 (2008), pp.228-238.

DOI: 10.1016/j.rcim.2006.10.006

Google Scholar

[5] F. K. Wang, T. Du and F. C. Wen, Product Mix in the TFT-LCD Industry, Production Planning and Control, Vol. 18 (2007), pp.584-591.

DOI: 10.1080/09537280701546757

Google Scholar