No-Excess Block Construction in Oil Drilling Platform Sevan Driller

Article Preview

Abstract:

The technique of hull block accuracy control is the main concern for modern shipbuilding. The method of no-excess block construction is introduced in Sevan Driller, the world’s first cylindrical ultra-deep offshore drilling platform. According to the structural characteristics of the drilling platform and production capacity, the partition and construction programs of the hull blocks are proposed. Modeling and drawing for platform in the design stage is analyzed. In the manufacturing stage, the factors affecting the block accuracy include plate-cutting, plate alignment, marking, assembling and welding. Additionally, the range of accuracy controlling aspect and compensation values are confirmed. The application of no-excess block construction in this drilling platform results in the improved quality of the drilling platform, reduced shipbuilding costs and the shortened shipbuilding cycle.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

537-541

Citation:

Online since:

January 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Z.J. Mao: China Petrochem Vol. 6 (2007), pp.67-69.

Google Scholar

[2] L.F. Yang, Y. Peng: Shipbuilding Of China Vol. 47 (2006), pp.26-30.

Google Scholar

[3] R.P. Li, Y.H. Xie, Z. Shu: China Offshore Platform Vol. 18(2003), pp.1-5.

Google Scholar

[4] M.H. Zhang: The Study of Lean Shipbuilding System (China Economy Press, Beijing 2005).

Google Scholar

[5] J.W. Ye: Introduction Of Modern Shipbuilding Technology (South China University Of Technology Press, Guangzhou 2001).

Google Scholar

[6] Y.J. Liu, Y.J. Li: Shipbuilding Of China Vol. 45 (2004), pp.81-86.

Google Scholar

[7] Z.L. Chen, Y.F. Xiong, Z.M. Li: Jiangsu Ship Vol. 25(2008), pp.36-39.

Google Scholar

[8] Y.J. Liu, R.Q. Hu, F.Z. Tian: Journal Of Harbin Engineering University Vol. 28(2007), p.723.

Google Scholar

[9] L.S. Richard: Production Planning and Control Vol. 10(1999), pp.127-137.

Google Scholar

[10] T. Wang, Z.R. Liu: Maring Technology Vol. 2(2003), pp.20-22.

Google Scholar

[11] G.J. Bruce, M. Z. Yuliadi, A. Shahab: Journal Of Ship Production Vol. 17(2001), pp.62-68.

Google Scholar

[12] Q.Y. Li: Maring Technology Vol. 5(2007), pp.9-12.

Google Scholar