Applied Mechanics and Materials
Vol. 460
Vol. 460
Applied Mechanics and Materials
Vol. 459
Vol. 459
Applied Mechanics and Materials
Vols. 457-458
Vols. 457-458
Applied Mechanics and Materials
Vol. 456
Vol. 456
Applied Mechanics and Materials
Vol. 455
Vol. 455
Applied Mechanics and Materials
Vol. 454
Vol. 454
Applied Mechanics and Materials
Vols. 448-453
Vols. 448-453
Applied Mechanics and Materials
Vols. 446-447
Vols. 446-447
Applied Mechanics and Materials
Vols. 444-445
Vols. 444-445
Applied Mechanics and Materials
Vol. 443
Vol. 443
Applied Mechanics and Materials
Vol. 442
Vol. 442
Applied Mechanics and Materials
Vol. 441
Vol. 441
Applied Mechanics and Materials
Vol. 440
Vol. 440
Applied Mechanics and Materials Vols. 448-453
Paper Title Page
Abstract: Concentrating on byproduct gas system with multiple pipeline networks, this paper established a mathematical model for byproduct gas scheduling (BGS) problem in iron and steel enterprises with consideration of supply priorities of consumption units. A decomposition algorithm is employed to transform the original model into an integer programming and a linear programming. The genetic algorithm is introduced as the solution mainframe to solve the integer programming problem and the linear programming problem iteratively. The result of practical-data-based experiment indicates that the proposed model and algorithm are feasible and effective.
4609