Integrated Scheduling of Container Terminal Process Based on CIMS

Article Preview

Abstract:

Container Terminal Scheduling System is a random, dynamic, nonlinear complex systems. How to schedule in order to achieve MES seamless connectivity for management system and control system, which is reseach focus of MES currently. Aiming at the production process and production management features for container terminal, a thorough research on CIMS of container terminal enterprise is taken, the relationships of information exchange that among the plan layer, the execution layer and control layer are analyzed. On the basis of control theory and system engineering theory, and viewpoint of process control, a closed MES control system is build. It is established step by step to achieve seamless integration MES by intelligent modeling and control compensation of scheduling. A new and original way for realizing accurate and transparency management in the production process and production optimization is provided.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

822-826

Citation:

Online since:

June 2011

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] MESA's next generation collaborative MES model.Pittsburgh: MESA International-White Paper Number 8, 2004.

Google Scholar

[2] Tianyou Chai, Yihui Jin, Dexiang Ren. Contemporary Integrated Manufacturing System Based on Three-layer Structure in Process Industry [J]. Control Engineering, 2002.9.(3):l-6.

Google Scholar

[3] ETERKOFSKY R.I. A branch and bound solution method for the crane scheduling problem[J]. Transportation Research. Part B,1990,24(3):159-172.

DOI: 10.1016/0191-2615(90)90014-p

Google Scholar

[4] E K Bish. A multiple-crane-constrained scheduling problem in a container terminal[J]. European Journal of Operational Research, 2003,144:83-107.

DOI: 10.1016/s0377-2217(01)00382-4

Google Scholar

[5] Zeng Qingcheng, Yang Zhongzhen. Integrating simulation and optimization to schedule loading operations in container terminals, Computers & Operations Research, 2009, 36(6)1935-1944.

DOI: 10.1016/j.cor.2008.06.010

Google Scholar

[6] Christian Bierwirth, Frank Meisel. A survey of berth allocation and quay crane scheduling problems in container terminals[J].European Journal of Operational Research, 2010, 202:615-627.

DOI: 10.1016/j.ejor.2009.05.031

Google Scholar

[7] Zhen Hong. Construction of Common Simulation Platform for Design of Container Terminal Stevedoring Technology[J]. Journal of system simulation,July 2006,18(7):1829-1834.

Google Scholar

[8] Tianyou Chai, Binglin Zheng, Huyi, Xiaoling Huang. Current Research Situation and Development of Manufacturing Execution Systems[J]. Control Engineering of China,,2005,11(3):1-6.

Google Scholar

[9] Xiaoling Huang, Yangang Chu, Yi Hu, Tianyou Chai.The Production Process Management System for Production Indices Optimization of Mineral Processing, 16th IFAC World Congress, (C)Prague, July 4-8, 2005.

DOI: 10.3182/20050703-6-cz-1902.01570

Google Scholar

[10] Xiaoling Huang, Jinliang Ding, Tianyou Chai. Study of scheduling based on production indices optimization for mineral processing[J]. Journal of Systems Engineering. 2006.21(2)136~142.

Google Scholar