Investment Control of Construction Project

Article Preview

Abstract:

The measures for effective investment control of construction project include: raise the scientific nature of feasibility study report, compile practical and feasible design task book, strengthen design bidding and quota design, optimize design scheme, compile scientific bidding documents, properly sign construction contracts, strictly control design changes, strengthen investment management of equipment and material, make good analysis on investment and budget, strictly control payment progress and quality, correctly prevent and treat claims, and carefully examine and verify quantities and costs.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2217-2220

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Hui Shi, Litian Sun. Shandong Coal Science and Technology. No. 5(2013), p.283. In Chinese.

Google Scholar

[2] Qinsheng Fu. Shanxi Architecture. Vol. 40(2014), pp.232-233. In Chinese.

Google Scholar

[3] Xiaoxian Han. Foreign Investment in China. No. 23(2013), p.154. In Chinese.

Google Scholar

[4] Yinghua Zhao. Construction Economy. No. 7(2013), pp.38-39. In Chinese.

Google Scholar

[5] Lifen Liu. Science & Technology Information. No. 7(2014), p.244. In Chinese.

Google Scholar

[6] Pei Shen, Tingting Zhang and Rang Zhu. Shandong Industrial Technology. No. 10(2013), p.116. In Chinese.

Google Scholar

[7] Xupeng Li. Building Science. No. 3(2014), p.207. In Chinese.

Google Scholar