The Way of Allocating Short-Supplied Talents in Multi-Project Based on Queuing Theory

Article Preview

Abstract:

In recent years, construction enterprises’ poor economic performance and the drain of senior technical personnel have been two cause-and-effect problems, which seriously restrict the enterprises’ long-term development, and the existing researches contribute little to solve the problems for managers. Considering the uncertainties of talents resource demand resulting from the difference of Multi-project schedule, a cyclic queuing theory of fixed number of customers was introduced from the enterprise management level. Then the risk loss curve and waiting loss curve could be simulated according to historical data and management experience. Finally, a best method to allocate the shortage of technical talents came out. The model was built throughout the management processes, so it owned not only high theoretical basis but also high operability, and has a better reference on solving the two construction enterprises problems.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

2225-2230

Citation:

Online since:

October 2014

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2014 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Su Peng. Modern Enterprise, 2011, (3): 22-23. In Chinese.

Google Scholar

[2] Cai Fang-Fang. Zhejiang Statistics, 2007, (8):40-41. In Chinese.

Google Scholar

[3] Chen Xiao-Dong. Theoretical research on large construction projects application: Program Management. Shanghai: Tongji University, 2004. In Chinese.

Google Scholar

[4] Zhang Li-Fen, Zhang Yaoyi. Project Management Technology, 2008, 6(4):26-30. In Chinese.

Google Scholar

[5] Patanakula P, Milosevicb D. The effectiveness in managing a group of multiple projects: Factors of influence and measurement criteria. International Journal of Project Management, 2009, 27(3): 216-233.

DOI: 10.1016/j.ijproman.2008.03.001

Google Scholar

[6] Levy N, Globerson S. Improving multi-project management by using a queuing theory approach. Project Management Journal, 1997, 28(4): 40–46.

Google Scholar

[7] Steyn H. Project management applications of the theory of constraints beyond critical chain scheduling. International Journal of Project Management, 2002, 20(1): 75-80.

DOI: 10.1016/s0263-7863(00)00054-5

Google Scholar

[8] Cohen L, Mandelbaum A, Shtub A. Muti-project scheduling and control: A process-based comparative study of the critical chain methodology and some alternatives. Project Management Journal, 2004, 35(2): 39-49.

DOI: 10.1177/875697280403500206

Google Scholar

[9] Dauzere-Peres S, Pavageau C. Extensions of an integrated approach for multi-resource shop scheduling. Systems, Man, and Cybernetics, 2003, 33(2): 207-213.

DOI: 10.1109/tsmcc.2003.814036

Google Scholar

[10] Fu Fang, Zhou Hong. Chinese Journal of Management Science, 2010, 18(2):120-126. In Chinese.

Google Scholar

[11] Zhang Zhi-Yu, Lv Ming-Li., Li Cong-Dong. Human Resource Development of China, 2010, 236(2):51-53. In Chinese.

Google Scholar

[12] Su Zhen-Dong. Research on resource optimization method in multi-project management in construction companies. Kunming: Kunming University of Technology, 2010. In Chinese.

Google Scholar

[13] Bunday, Brain D. An Introduction to Queuing Theory. New York: John Wiley﹠Sons, (1996).

Google Scholar