Research on the Unloading Process of Long-Span Steel Roof and the Design of Temporary Bracing Structure

Article Preview

Abstract:

Unloading is a complicated process that the load-carrying condition of main structure is gradually transferred and the internal force is redistributed, and so the exact numerical simulation applied on the unloading process is crucially important. The steel roof composed of the space tubular truss with the long-span and cantilevered structure for the Helan Shan stadium at Yinchuan city in Ningxia Hui autonomous region is taken as an analytical example and the finite element analysis software SAP2000 is used to simulate the unloading process during the steel construction. The computational model is established and the simulation method is provided for investigating the detailed unloading process of steel roof. The load-carrying characteristic of every bracing point acquired by the numerical simulation analysis is applied to analyze and evaluate the structural performance under two different comparable unloading cases and then an optimized unloading scheme is achieved from these two cases. The deformation of steel roof and stress ratio of steel member at each different unloading step during the whole unloading process are presented. Ultimately, based on the preferable unloading scheme, the temporary bracing structure is designed by using the maximum reaction of bracing points when unloading.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 163-167)

Pages:

251-258

Citation:

Online since:

December 2010

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2011 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Guanqun Li, Shenglu Song: Building Construction, 2009, 31(11): 927-930. (In Chinese).

Google Scholar

[2] Xiaoqiang Cui, Yanlin Guo, Keming Ye. Engineering Mechanics, 2006, 23(5): 83-88. (In Chinese).

Google Scholar

[3] Jinghui Pang, Kekuan Lu: Architecture Technology, 2007, 38(7): 532-534. (In Chinese).

Google Scholar

[4] Jinsheng Jiang, Keming Ye: Journal of Building Structures, 2006, 27(5): 118-122. (In Chinese).

Google Scholar

[5] Xiaoping Wu, Zhenfeng Gao: Journal of Building Structures, 2005, 26(5): 40-45. (In Chinese).

Google Scholar

[6] Chuanping Chen, Jinyao Hua: Zhejiang Construction, 2009, 26(4): 47-52. (In Chinese).

Google Scholar

[7] Xinjian Chang, Jianmin Zhou: Building Construction, 2007, 29(5): 325-327. (In Chinese).

Google Scholar

[8] Hui Zhou, Zhanwen Xiao: Architecture Technology, 2008, 39(6): 435-438. (In Chinese).

Google Scholar

[9] Yanlin Guo, Yufei Guo, Xuewu Liu: Journal of Architecture and Civil Engineering, 2007, 24(1): 52-58. (In Chinese).

Google Scholar