Effect of Working Parameters on the Damage of Ladder Impact Drill

Article Preview

Abstract:

The step face of the large-scale ladder impact drill is easy to generate fracture damage. The unreasonable working parameters are an important factor for the fracture damage in addition to the irrational structure. In this paper, three working parameters consisting of drill impact height, impact frequency and impact stratum for damage are studied from two perspectives of theoretical analysis and finite element analysis.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 424-425)

Pages:

506-510

Citation:

Online since:

January 2012

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2012 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Ye Y.T.: The Engineering of Impact Drilling in Deep Water Depth of Large Diameter Piling. West-China Explor. Eng. 1, 51-52 (2007) (in Chinese).

Google Scholar

[2] Wang X., Yu F.S., Dong M.Q., et al:Computer Simulation of Fracture Damage for Large-diameter Percussive Drill. Adv. Mater. Res. 4, 2071-2075(2011).

DOI: 10.4028/www.scientific.net/amr.189-193.2071

Google Scholar

[3] Wang X., Yu F.S., Song X.C.: Computer Simulation Study on Fracture for Large Impact Drill. J. Shandong Jianzhu Univ., 26, 84-87 (2011) (in Chinese).

Google Scholar

[4] Cao Y.L.: Failure of large diameter deep hole drilling tool. Min. Res. Devel. (China), 20, 33-34 (2000) (in Chinese).

Google Scholar

[5] Hui X.B.: Harbin-Dalian railway passenger dedicated bored piles and study of auger drill construction. Chengdu: Southwest Jiaotong University (2003) (in Chinese).

Google Scholar

[6] Yan E.F.: Experiment and Analysis Study on Percussion Device of CHF-20 Percussion and Rotary Reverse Circulation Drilling Rig. Changchun: Jilin University 1-7, (2005) (in Chinese).

Google Scholar

[7] Yan T.N.: Geotechnical Drilling Engineering. Wuhan: China University of Geosciences Press (2009) (in Chinese).

Google Scholar

[8] Wu W.X.: Damping measures study for the power house base under the geological conditions at the fault fracture zone. Gansu Water Conservancy and Hydropower Technology, 44, 397-399 (2008) (in Chinese).

Google Scholar

[9] Zhan S.B., Wang D.X.: Drilling Process Analysis of the CJF-20 Percussion Drill Rig of Reverse Circulation. Geol. Sci. Technol. Inform. (China), 18, 23-24, (1999) (in Chinese).

Google Scholar