[1]
Cowling, P. I., Ouelhadj, D., Petrovic, S.: Multi-agent systems for dynamic scheduling, In M. Garagnani, (Ed. ), Proceedings of the nineteenth workshop of planning and scheduling of the UK, The Open University, UK, 45—54(2000).
Google Scholar
[2]
Cowling, P. I., Ouelhadj, D., Petrovic, S.: A multi-agent architecture for dynamic scheduling of steel hot rolling, In Proceedings of the third international ICSC world manufacturing congress, Rochester, NY, USA, 104-111(2001).
Google Scholar
[3]
Cowling, P. I., Johansson, M.: Using real-time information for effective dynamic scheduling, European Journal of Operational Research, 139(2), 230-244(2002).
DOI: 10.1016/s0377-2217(01)00355-1
Google Scholar
[4]
Cowling, P. I., Ouelhadj, D., Petrovic, S.: A multi-agent architecture for dynamic scheduling of steel hot rolling, Journal of Intelligent Manufacturing, 14, 457-470(2003).
DOI: 10.1023/a:1025701325275
Google Scholar
[5]
Cowling, P. I., Ouelhadj, D., Petrovic, S.: Dynamic scheduling of steel casting and milling using multi-agents, Journal of Production Planning and Control, 15, 1—11(2004).
DOI: 10.1080/09537280410001662466
Google Scholar
[6]
Ouelhadj, D., Cowling, P. I., Petrovic, S.: Contract net protocol for cooperative optimization and dynamic scheduling of steel production, In A. Ibraham, K. Franke, M. Koppen (Eds. ), Intelligent systems design and applications, Berlin, Springer, 457-470(2003).
DOI: 10.1007/978-3-540-44999-7_45
Google Scholar
[7]
Ouelhadj, D., Cowling, P. I., Petrovic, S.: Utility and stability measures for agent-based dynamic scheduling of steel continuous casting, In Proceedings of the IEEE international conference on robotics and automation, Taipei, Taiwan, 175-180(2003).
DOI: 10.1109/robot.2003.1241592
Google Scholar
[8]
L. X. Tang, J. Y. Liu, A. Y. Rong, and Z. H. Yang: A mathematical programming model for scheduling steelmaking-continuous casting production scheduling, European Journal of Operational Research, 120, 423-435(2000).
DOI: 10.1016/s0377-2217(99)00041-7
Google Scholar