IEC61850-Based Analysis of Coal Mine Ground Transformer Substation Integrated Automation Communication System

Article Preview

Abstract:

Places of importance of coal mine ground transformer substation in mine electric power supply, according to this article the IEC61850 standard, through the analysis of the function of substation secondary equipment, from the structure of integrated substation automation system-oriented, hierarchical and logical interfaces and interoperability focus analysis of IED, making coal mine ground transformer substation integrated automation communication systems tend to be reasonable. This article is intended to point out that the IEC61850 standard application supports peer to peer traffic patterns, GOOSE information transmission mechanisms will be hard to be effective in reducing IED device wiring, greatly simplifies design and experiment of secondary system for engineering application interoperability between different manufacturers when IED provides effective support.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

199-202

Citation:

Online since:

December 2012

Authors:

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2013 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

[1] Hu Liang, Wang Qian. Based on IEC 61, 850 IEC 61, 970 seamless communication systems research. Power system communication,2007, 28(12): 15-19.

Google Scholar

[2] Hu Liang, Wang Qian. Based on IEC 61, 850 IEC 61, 970 seamless communication systems research. Power system communication, Zhu Yongli, Wang Dewen, di Jian, Zhai Xueming. Follow the IEC 61, 850 new networked power transmission system. Journal of North China electric power University, 2008, 35(16): 57-61.

DOI: 10.1109/tdc.2008.4517287

Google Scholar

[3] Hejiang electric power company, Q/ZDJ 48-2006, based on common graphic SVG rules. (2006).

Google Scholar

[4] Sun Ying,Acentralized microcomputer protection and supervisory contral systemfor unmanned substation,(Automation of ElectricPower Systems),1997,21(3):64-66.

Google Scholar

[5] Zhou Li,Research onthe integral automation system for 35kV substation,(Relay),1998,26(2):30-32.

Google Scholar

[6] Lia Zeyou,Yang Qixun,A new scheme of substation automation system,(Relay),1998,26(4):37-38.

Google Scholar

[7] Cao MaoshengSome problems in automation of 500kV substation,(Power System Technology),1998,22(8):38-41.

Google Scholar