Setup Time Reduction: A Case Study of a Wire Coating Extruder Machine

Article Preview

Abstract:

This action research aims to reduce the setup time of a wire coating extruder machine. The case company performed about 6 setups per day, with an average setup time of 58.67 minutes per setup, resulting in a total setup time of approximately 352.02 minutes per day. The Single Minute Exchange of Dies (SMED) technique, based on the principles of Shigeo Shingo, was applied. The machine setup was divided into 7 stages to suit the needs of the case study company. After the improvements, the setup time was reduced to 31.97 minutes per setup, resulting in a 45.51% increase in machine operation efficiency. The tools and techniques used in this research can be applied to similar machines for continuous improvement.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

101-105

Citation:

Online since:

May 2025

Export:

Price:

Permissions CCC:

Permissions PLS:

Сopyright:

© 2025 Trans Tech Publications Ltd. All Rights Reserved

Share:

Citation:

* - Corresponding Author

[1] Shingo, S. (1985). A Revolution in Manufacturing. The SMED System. Productivity Press, Cambridge, MA.

Google Scholar

[2] Rosa, C., Silva, F.J.G., Ferreira, L.P., Campilho, R. (2017). "SMED methodology : The reduction of setup times for Steel Wire-Rope assembly lines in the automotive industry", Manufacturing Engineering Society International Conference. Procedia Manufacturing pp.1034-1042

DOI: 10.1016/j.promfg.2017.09.110

Google Scholar

[3] Jan, F. (2016). "The Single Minute Exchange of Die Methodology in a High-Mix Processing Line", Journal of Competitiveness, Vol.8, Issue 2, pp.59-69

Google Scholar

[4] Sousa, E., Silvaa, F.J.G., Ferreiraa, L.P., Pereiraa, M.T., Gouveiaa, R., Silvab, R.P. (2018). "Applying SMED Metodology in cork stoppers production", International Conference on Flexible Automation and Intelligent Manufacturing (FAIM2018), June 11-14, 2018, Columbus, OH, USA. Procedia Manufacturing pp.611-622

DOI: 10.1016/j.promfg.2018.10.103

Google Scholar

[5] Karam, A., Liviu, M., Cristina, V., Radud, H. (2018). "The contribution of lean manufacturing tools to changeover time decrease in the pharmaceutical industry. A SMED project", INTER-ENG Interdisciplinarity in Engineering. Procedia Manufacturing, vol. 22, pp.886-892

DOI: 10.1016/j.promfg.2018.03.125

Google Scholar